Design Of Nablus-West WWTP
An-Najah University Civil Engineering Department Graduation Project #2 Design Of Nablus-West WWTP Prepared by: Supervised by: Allam Aghbar Islam Janem Mohammad Kukhun Dr. Abdel Fattah R. Hasan 23/05/2012
2
Content Background Objectives Population Analysis
Wastewater Generation Stormwater and Infiltration SewerCAD Analyses Waste water treatment plant design Results and Recommendations
3
Background Location Nablus district is located in the northern part of the West Bank. Nablus
4
Background Topography
Nablus lies in a valley between two mountains, Ebal Mount and Gerzim Mount Ebal Mount Climate Climate in Nablus is rainy in winter, hot and dry in summer Gerzim Mount
5
Background Precipitation The annual mean rainfall is 664 mm Humidity
The mean annual relative humidity of Nablus district is 62% R H
6
Objectives The ultimate goal of this project is to enhance the sanitation sector in the Nablus city, that will lead to: Prevention of disease and nuisance condition Providing clean water supply for irrigation Avoidance contamination of water supply
7
Objectives These goals should be established by achieving the following objectives of the project: Design of wastewater conveyance system Design of wastewater treatment plant
8
Study Area Nablus Der sharaf Zawata Beit ebba Qosin West Beit wazan
East
9
Population Analysis 1997 2007 2012 Palestinian Central Bureau of Statistics 248,102 317,298 356,129 Constant growth rate method 358,818 Geometric growth rate method 358,490 Arithmetic method 352,943
10
Population Analysis 2007 2012 2042 West-Nablus 74,868 84,367 177,071
Zawata 1,855 2,129 4,387 Beit wazan 1,046 1,178 2,474 Beit ebba 3,116 3,497 7,370 Qosin 1,691 1,897 3,999 Der sharaf 2,434 2,731 5,757 Total 85,010 95,799 201,058
11
Water Consumption m3/year ≈ 120 L/day
12
Wastewater Generation
Water consumption = 120 L/c.d Design period = 30 year Return flow = 80% Hourly peak factor = 3 Infiltration = 10% of mean daily wastewater Stormwater generate only from the old city
13
Stormwater Q storm = C × I × A = 3,042 L/s
C = 0.9 A = 27.6 ha I = 120 (L/s.ha) Return period = 4 years Rainfall duration = 12 (min)
14
Wastewater Generation
Population 2042 Wastewater (L/s) Infiltration (L/s) Stormwater (L/s) Total amount (L/s) West-Nablus 74,868 590.2 19.7 3,024 3,634 Zawata 1,855 14.6 0.5 - 15.1 Beit wazan 1,046 8.3 0.3 8.5 Beit ebba 3,116 24.6 0.8 25.4 Qosin 1,691 13.3 0.4 13.8 Der sharaf 2,434 19.2 0.6 19.8 Study Area 201,058 670 22 3,717
15
The Main Trunk
16
SewerCAD Analyses Using manning equation in hydraulic analysis
Manning coefficient = 0.013 Velocity range: m/s All pipes are circular and made of concrete. All diameters are 1.4 m
17
SewerCAD Analyses
18
SewerCAD Analyses
19
Velocity (Average) (m/s)
SewerCAD Analyses Velocity (Average) (m/s) Slope (m/m) Invert (Stop) (m) Stop Node Invert (Start) (m) Start Node Label 4.03 0.01 421.46 MH-2 421.66 MH-1 CO-1 421.34 MH-3 421.44 CO-2 420.11 MH-4 421.11 CO-3 418.41 MH-5 419.01 CO-4 416.66 MH-6 417.16 CO-5 415.25 MH-7 415.95 CO-6 414.19 MH-8 414.79 CO-7 410.63 MH-9 411.38 CO-8 407.98 MH-10 408.58 CO-9 405.5 MH-11 406.1 CO-10 403.93 MH-12 404.38 CO-11
20
SewerCAD Analyses Profile section
21
Design of wastewater treatment plant
Primary Screening Grit Removal Primary sedimentation secondary Aeration Secondary sedimentation Advanced Disinfection
22
Design of wastewater treatment plant
23
Depth in the conduit (m)
Screening This is the first step in preliminary treatment process which aims to remove floating and suspended matter such as paper, cloth. Quantity of screenings = 0.9 m3/day Design criteria Bar spacing (mm) Depth in the conduit (m) slope Bar depth (mm) Bar width (mm) Velocity (m/s) 50 0.53 60° 35 10 0.6
24
Grit Removal Chamber Grit chamber used to remove grit sand and other material manly to protect moving mechanical equipment and pumps from unnecessary wear and abrasion No. of tube Blower capacity Detention time (min) Length (m) Total Depth (m) Width( m ) 22 8.775 m3/min 4 19.5 3.5 4.5
25
Primary sedimentation tank
It removes 90% to 95% of settealble solid ,and remove 30% to 40% of BOD also reduce total suspended solid 50% to 70% . No. Width (m) Length Total depth Slope % Weir length Weir section 4 6 24 1.35 50 0.2 m
26
Aeration Is used to receive the flow from many entrance to prevent the excess concentration of bacteria in one location.
27
Secondary sedimentation Tank (Biological Process)
The objective of biological treatment is to reduce BOD to be with the standard, using bacteria Overflow rate (m3/m2.d) Detention time (hr) Weir loading (m3/m.d) Flow rate (m3/d) average liquid depth (m) 20 3 110 40,000 2.1 No. Width (m) Length (m) Total depth (m) Slope (%) Weir length (m) Weir section (m) 2 16 64 3 1.35 82.8 0.3
28
Disinfection The process designed to kill or inactivate most microorganisms in wastewater, including essentially all pathogenic (disease-causing) organisms Width (m) Length (m) Height (m) 1.6 64 4.8
29
Results and Recommendations
The main trunk can carry the wastewater without flooding . In wastewater treatment plant design we followed a series of processes that helped to achieve the acceptable level of treated waste water.
30
Results and Recommendations
The outputs of treatment processes are treated water and sludge. The treated water can be used as an irrigation water in wadi al-zomar ,for olive, almonds, that will lead to reduce the amount of pure water consumption for irragation and the extract sludge can also be used as a fertilizers.
31
THANKS FOR LISTENING