1 Team Members: Michael J. Higgins Anthony Virata Joseph Banks Gary Calpo Khuram Imtiaz Abdul Khan

2 SBIR Approval -Presented by Michael Higgins
Societal Problem Why Should We Care? The RMS Solution RMS Project Plan Phase Zero Phase One Phase Two Phase Three Out Years Evaluation Plan Funding Plan Marketing Plan Contractual Aspects Risk Management Plan Conclusion Sunday, June 30, 2019

3 The Societal Problem Increasing demand, wasteful usage, and finite resources lead to energy and natural resource shortages Sunday, June 30, 2019

4 Resource Use and Production
Sunday, June 30, 2019

5 “Total electricity demand is projected to grow by 1
“Total electricity demand is projected to grow by 1.9 percent per year from 2001 through 2020” – Energy Information Administration, U.S. Department of Energy Sunday, June 30, 2019

6 Energy use per capita,1970-2025(index,1970 = 1)
History: Energy Information Administration, Annual Energy Review 2001, DOE/EIA-0384(2001) (Washington, DC, August 2002). Projections: Table A20. Sunday, June 30, 2019

7 Estimated Energy Waste
About 42.5% of the energy used in the U.S. is wasted due to inefficient use. -Penn State University Sunday, June 30, 2019

8 Spot-Checked global electricity consumption
source: US Department of Energy Sunday, June 30, 2019

9 Estimated Total Waste Sunday, June 30, 2019

10 Why Should We Care? Sunday, June 30, 2019

11 California Energy Crisis
Demand outweighed production California energy companies were forced to buy out of state electricity Electricity costs went from $29.71 per Mwh to $ per Mwh Electric bills went up 59% -department of energy Sunday, June 30, 2019

12 Consumption Exceeds Production
Energy Cite and Virginia power maintain that consumption can be reduced by 15% when consumers are informed on energy use and increase efficiency Total electricity demand is projected to grow by 1.9 percent per year from 2001 through 2020” – Energy Information Administration, U.S. Department of Energy Sunday, June 30, 2019

13 What RMS is and how it can help to reduce waste.
The RMS Solution What RMS is and how it can help to reduce waste. Using energy wisely is no secret. It's simply a matter of awareness, knowledge and planning. –Dominion Virginia Power’s Website Sunday, June 30, 2019

14 What is RMS? Web-based tool to bring real-time consumption data to the utility customer Capable of monitoring electric, water, natural gas, and oil consumption Displays current resource use Analyzes consumption data and displays it in graphical format Penalty notifications Peak-demand notifications Budgeting tool Water/Gas leak detection *RMS Technical Approach Sunday, June 30, 2019

15 RMS Product Goals Educate businesses and homeowners on their resource usage patterns Be on the market before the crisis point is reached, that is when the need exceeds the supply (Our projection year is 2008) Market to: Utility Companies (Electric, Gas, Oil) Public Works (Water) Inform the consumer of peak demand times and government imposed limits Provide an intuitive user interface Format the data in a way that is useful to the consumer Sunday, June 30, 2019

16 Data Flow Diagram Sunday, June 30, 2019

17 Sunday, June 30, 2019

18 Product Demonstration
Sunday, June 30, 2019

19 Product Demonstration
Sunday, June 30, 2019

20 Product Demonstration
Sunday, June 30, 2019

21 Product Demonstration
Sunday, June 30, 2019

22 RMS and Automated Meter Reading (AMR) Past, Present, and Future
Sunday, June 30, 2019

23 RMS Project Plan RMS Project Schedule
The Resource Monitoring System (RMS) project will span three years beginning on 2/12/2003 and ending on 4/3/2006 with the shift to the out years. This project will be completed by employing a four-phase plan. RMS Project Schedule Sunday, June 30, 2019

24 Phase Zero, Conception Phase Deliverables
This phase is called the “CONCEPTION PHASE”, which will span 65 days beginning on 2/12/2003 and ending on 5/8/2003 with a phase 1 approval. Phase Deliverables Initial Project Research Feasibility Presentation Milestone Planning Presentation RMS Web Site SBIR Grant Proposal Document SBIR Approval Presentation Sunday, June 30, 2019

25 Phase Zero Schedule Sunday, June 30, 2019

26 Phase Zero Personnel Research and Development Manger Finance Manager
Project Manager Research and Development Manger Finance Manager Legal Manager Marketing and Sales Manager Web and Software Development Manager Sunday, June 30, 2019

27 Phase Zero Management Structure
Phase Zero Management Plan Phase Zero Management Structure Sunday, June 30, 2019

28 PHASE 1, Proof Of Concept Phase Deliverables
This phase is called the “PROOF OF CONCEPT PHASE”; which will span over 88 days. It will continue between Mon 5/12/03 and Fri 8/15/03. Phase Deliverables Prototype Design Completed Lab Prototype Database RMS Software AMR Simulator Preliminary Production Specs Business Plan Sunday, June 30, 2019

29 Phase 1 Schedule Sunday, June 30, 2019

30 Phase 1 Personnel Project Manager Research Manager Finance Manager
Legal Manager Marketing Manager Web/Software Manager DBA SQL Programmer Java/Web Programmer Lawyer Labor Total $65,561.44 Sunday, June 30, 2019

31 Phase 1 Management Structure
Sunday, June 30, 2019

32 Phase 1 Budget Phase Total Software Total $3,341.00 Hardware Total
Software Component Description Quantity Unit Cost Sub Total Database/Application Server: NuSphere PHPed - MySQL/PHP/Apache 2 $299.00 $598.00 Operating System: RedHat Linux 9 Professional $149.00 $298.00 Dreamweaver MX $700.00 $1,400.00 SSL Certificate 1 $200.00 Miscellaneous Software Tools $845.00 Software Total $3,341.00 Hardware Component Description Quantity Unit Cost Sub Total Dual processor Server 2 $2,000.00 $4,000.00 Workstation w/OS and Office Suite 11 $1,500.00 $16,500.00 Wireless Network Card 1 $150.00 Wireless Network Access Point/Router $200.00 Managed Fast Ethernet Switch $500.00 Laptop Computer w/OS and Office Suite 6 $9,000.00 Miscellaneous cables, connectors, tools. $745.00 Hardware Total $31,095.00 Phase Total Software Total $3,341.00 Hardware Total $31,095.00 Labor Total $65,561.44 Overall Phase I Total $99,997.44 Slide : 32 Sunday, June 30, 2019

33 PHASE 2, Prototype and Development
This phase is called the “INITIAL PROJECT”; which will span over 438 days. It will continue between Mon 9/8/03 and Thu 5/12/05 Phase Deliverables Production Specs Management Plan Personnel Plan Test and Evaluation Plan Working Functional Prototype Sunday, June 30, 2019

34 Phase 2 Schedule Sunday, June 30, 2019

35 Phase 2 Personnel Project Manager Research and Development Manger
Finance Manager Legal Manager Marketing and Sales Manager Web and Software Development Manager Java Programmer (2) SQL Programmer (2) Contractor - Equipment Install Contractor - Network Install System Manager Technician Database Administrator Lawyer Document Specialist Customer Support (3) Sunday, June 30, 2019

36 Phase 2 Management Plan Sunday, June 30, 2019

37 Phase 2 Budget Phase Totals Software Total $22,540.00 Hardware Total
Software Total $22,540.00 Hardware Total $91,995.00 40% Overhead $162,081.12 10% $68,181.89 Overall Phase II Total $750,000.81 Labor Total $405,202.80 Sunday, June 30, 2019

38 PHASE 3, Production Phase Deliverables
This phase is called the “PRODUCTION PHASE”; which will span over 232 days and it will continue between Wed 5/13/05 and 4/3/06 Phase Deliverables Customer Acceptance Testing Production Finalization Developed Out-Year Approach Developed Out-Year Organization Shift to Out-Years Sustained RMS System Continued Development Expansion of Market Sunday, June 30, 2019

39 Phase 3 Schedule Sunday, June 30, 2019

40 Phase 3 Management Plan Sunday, June 30, 2019

41 Phase 3 Budget Phase Total $262,739.20 Software Total $32,110.00
$262,739.20 Software Total $32,110.00 Hardware Total $221,350.00 40% Overhead $105,095.68 10% $62,129.49 Overall Phase III Total $683,424.37 Labor Total Sunday, June 30, 2019

42 Budget Totals TOTALS FOR PHASE I, II, AND III Phase I $99,998.14
Phase I $99,998.14 Phase II $750,000.81 Phase III $683,424.37 OVERALL TOTAL $1,533,423.32 Sunday, June 30, 2019

43 Out Years Budget and Personnel
Project Manager Research Manager Finance Manager Legal Manager Marketing Manager Web/Software Manager System Manager SQL Programmer Java/Web Programmer Lawyer Lobbyist Customer Service Technician (10) Out-Years Budget (First Year) Software Total $20,450.00 Hardware Total $120,000.00 Labor Total $1,444,205.00 10% $158,465.50 Overall Out-Year Total $1,743,120.50 Sunday, June 30, 2019

44 Evaluation Plan Program Design Reviews Technical Reviews
Assessment of the project at the early stages of each phase Technical Reviews Evaluates the direction taken in design, development, and testing of the project Includes System Requirements Review (SRR), Preliminary Design Review (PDR) , and Critical Design Reviews (CDR) Quality Reviews Evaluate the processes used by team members to perform tasks, including the evaluations Evaluate deliverables for compliance with contractual requirements Recommend corrective and preventive actions if necessary Periodical Reporting Used to track progress of the project Sunday, June 30, 2019

45 Funding Plan http://www.science.doe.gov/sbir
Sunday, June 30, 2019

46 Marketing Strategy Market to Utilities Market to Public Works
Increased Competitiveness More Capable of Providing Energy on Demand During Peak Usage Times Capable of Passing the Cost on to the Consumer Market to Public Works Environmentally Friendly Political Issue More Capable of Providing Water During Drought Times Without Adding Additional Pipelines Estimated Charge: $1.00 per registered user per month Slide : 46 Sunday, June 30, 2019

47 Estimated Return on Investment
Sunday, June 30, 2019

48 Incentives for Nashville Electric
Increased Competitiveness with Other Electricity Resellers More Capable of Providing Energy on Demand During Peak Usage Times Capable of Passing the Cost on to the Consumer The Hardware is Currently In Place Enhances NES’s Budget Billing Program Enhances NES’s Power Promise of Lower Rates under 2000KWh Free of Charge During Phase 2 Sunday, June 30, 2019

49 Contractual Plan Infrastructure Installation Power Companies
To help install the network and technological infrastructure (RHCE, CCNA, or equivalent) Power Companies Nashville Electric Services (phase 2) Pico and others after phase 2 Natural Gas Companies Oil Providers Public Works Departments (per city) AMR Companies Agreements to expand and implement the technology (during Phase 3 and out years) Advanced Technologies Ramar (ATR) Sunday, June 30, 2019

50 Risks Risk Types Risks Probability Consequence Marketing Risk
Insufficient Market Low Severe Lack of Utility Company Cooperation Moderate Competition Inability to Secure Sufficient Funding Lack or Loss of User Interest in RMS Legal Risk Lack of Government Cooperation Technical Risk Compatibility with Utility Company Databases Low to Moderate Customers may be overwhelmed with the myriad of data provided Fair Production Risk Loss of a Vendor or Equipment Supplier Sunday, June 30, 2019

51 Risk Management Plan Lack of Utility Company/ Public Works Cooperation
Solution: To develop systems that can function independent from the utility's meters. The main draw is the cost of the system will go up as the client will have to pay for the equipment and installation of the monitoring devices. Consumers may loose interest and not use the service after the novelty wears off Solution: RMS will continually be developed to better provide for the consumers needs Information overload – Consumers may be overwhelmed with the myriad of data provided Solution: RMS will format the data in a way that is not overwhelming and is easy to understand and apply. Competition Solution: RMS will offer a wide variety of systems to encompass a larger customer base, specifically the home market where costs have generally made these types of systems uncommon. Compatibility with Utility Company Databases Solution: Plan for extra development time during this part. Sunday, June 30, 2019

52 Why should ODU approve RMS as a semester project??
-Page 12 in the SBIR Proposal Document Sunday, June 30, 2019

53 Sunday, June 30, 2019

54 Questions?? Sunday, June 30, 2019