Presentation is loading. Please wait.

Presentation is loading. Please wait.

Agenda Updates: 10:00 – 10:10: Luke; infrastructure enhancements over the last several months, and continuing installations this winter. 10:10 – 10:15:

Similar presentations


Presentation on theme: "Agenda Updates: 10:00 – 10:10: Luke; infrastructure enhancements over the last several months, and continuing installations this winter. 10:10 – 10:15:"— Presentation transcript:

1 Agenda Updates: 10:00 – 10:10: Luke; infrastructure enhancements over the last several months, and continuing installations this winter. 10:10 – 10:15: Xubin; update on ARO proposal involving aboveground instrumentation. 10:15 – 10:20: Russ; update on STC-related ideas for future vegetation scenarios at LEO. 10:20 – 10:30: Peter; updates WEES proposal, VP funding, and NSF proposals and opportunities for experiments within the context of those awards. Discussion: 10:30 – 11:00: Open discussion about 1) whether or not to add rainfall to LEO-C and LEO-W to equalize cumulative total rainfall with LEO-E, and if so, how to use that water for experimental purposes. 2) Ideas for long-term rainfall applications at LEO, which could begin summer of 2015.

2 Below-ground instrumentation operational for all three landscapes.

3 Above-ground instrumentation operational on LEO-E.

4 Online database contains new downloadable variables and data-visualization tools.
On UA Network: On any other network:

5 All irrigation circuits for all slopes are calibrated

6 Final smoothing of soil surfaces complete on all landscapes

7 Final smoothing of soil surfaces complete on all landscapes

8 Air partitions between each bay are in place.

9 Installation of the first aerial track system for imaging systems is underway.

10 Winter/Spring of 2014/2015 Acquisition and Installation of aboveground instruments for LEO-C and LEO-W B2 Arborist/Climber and one new technician to aid with equipment installation Working toward completion by summer of 2015


Download ppt "Agenda Updates: 10:00 – 10:10: Luke; infrastructure enhancements over the last several months, and continuing installations this winter. 10:10 – 10:15:"

Similar presentations


Ads by Google