Download presentation
Presentation is loading. Please wait.
1
Wake-up Radio (WUR) SG November 2016 Agenda
January 2016 doc.: IEEE /1472r0 November 2016 Wake-up Radio (WUR) SG November 2016 Agenda Date: Authors: Minyoung Park (Intel Corp.) Edward Au (Huawei Technologies)
2
IEEE 802.11 WUR SG San Antonio, TX, USA November 6 - 11, 2016
Chair: Minyoung Park (Intel) Vice Chair: Yunsong Yang (Huawei) Secretary: Leif Wilhelmsson (Ericsson) Minyoung Park (Intel Corp.)
3
November 2016 Abstract This presentation contains the IEEE Wake-up Radio (WUR) SG agenda for the November 2016 session Minyoung Park (Intel Corp.)
4
November 2016 Meeting Protocol Please announce your name and affiliation when you first address the group during a meeting slot Minyoung Park (Intel Corp.)
5
Attendance http://newton.meeting.verilan.com Register
November 2016 Attendance Register Indicate attendance Minyoung Park (Intel Corp.)
6
Attendance, Voting & Document Status
November 2016 Attendance, Voting & Document Status Make sure your badges are correct If you plan to make a submission be sure it does not contain company logos or advertising Questions on Voting status, Ballot pool, Access to Reflector, Documentation, member’s area see Jon Rosdahl – Cell Phones Silent or Off Minyoung Park (Intel Corp.)
7
WUR SG Schedule for the Week
November 2016 WUR SG Schedule for the Week Monday Tuesday Wednesday Thursday AM1 WUR SG AM2 PM1 PM2 EVE Minyoung Park (Intel Corp.)
8
Main Agenda Items for the Week
November 2016 Main Agenda Items for the Week Review and resolve comments from other WGs and EC members Revise PAR and CSD based on the resolutions before the WG mid-week plenary meeting Submit the revised PAR and CSD for the WG approval in the mid-week plenary meeting SG extension SG timeline review Minyoung Park (Intel Corp.)
9
Call for Submissions November 2016
11-16/1379, “On error rate performance of OOK in AWGN” Simon Qu (Blackberry), 20min 11-16/1400r0, “Power Efficient WUR AP Discovery” Xiaofei Wang (InterDigital) 11-16/1445 “Overall MAC Procedure for WUR” Kiseon Ryu (LG Electronics) 11-16/1501, “AP Discovery using WUR,” Igor Kim (ETRI) 11-16/1504, “Discussion of WUR Packets Design,” Ke Yao (ZTE) 11-16/1506r0, “Coexistence Mechanism for Wakeup Radio Signal Follow-up,” Yongho Seok (NEWRACOM) 11-16/1465, “WUR usage model,” Ross (Huawei) 11-16/1470, “Wake-up and Data Exchange Sequences,” John Son (WILUS) 11-16/1460, “WUR MAC discussion,” Liwen Chu (Marvell) 11-16/1326r1, “Feedback from the PAR Review SC,” Jon Rosdahl Minyoung Park (Intel Corp.)
10
Agenda November 2016 Tuesday, November 8th, PM1, 13:30-15:30
Call meeting to order WUR SG introduction Call for submissions Review agenda and approval IEEE 802 and IPR Policy and procedure Summary from September 2016 plenary meeting and teleconferences Motion: September 2016 meeting minutes (doc: IEEE /1248r0) Presentations Recess Tuesday, November 8th, EVE, 19:30-21:30 Review and resolve comments from other WGs and EC on the PAR and CSD Wednesday, November 9th, AM1, 08:00-10:00 Call meeting to order IEEE 802 and IPR Policy and procedure Complete comment resolution Revise the PAR and CSD SG motions: approve the revised PAR and CSD Presentations Recess Thursday, November 10th, AM2, 10:30 – 12:30 Motion: SG extension SG timeline Discussion on the task group formation meeting in January 2017 Teleconference call schedule Adjourn Minyoung Park (Intel Corp.)
11
Instructions for the WG Chair
November 2016 Instructions for the WG Chair The IEEE-SA strongly recommends that at each WG meeting the chair or a designee: Show slides #1 through #4 of this presentation Advise the WG attendees that: The IEEE’s patent policy is consistent with the ANSI patent policy and is described in Clause 6 of the IEEE-SA Standards Board Bylaws; Early identification of patent claims which may be essential for the use of standards under development is strongly encouraged; There may be Essential Patent Claims of which the IEEE is not aware. Additionally, neither the IEEE, the WG, nor the WG chair can ensure the accuracy or completeness of any assurance or whether any such assurance is, in fact, of a Patent Claim that is essential for the use of the standard under development. Instruct the WG Secretary to record in the minutes of the relevant WG meeting: That the foregoing information was provided and that slides 1 through 4 (and this slide 0, if applicable) were shown; That the chair or designee provided an opportunity for participants to identify patent claim(s)/patent application claim(s) and/or the holder of patent claim(s)/patent application claim(s) of which the participant is personally aware and that may be essential for the use of that standard Any responses that were given, specifically the patent claim(s)/patent application claim(s) and/or the holder of the patent claim(s)/patent application claim(s) that were identified (if any) and by whom. The WG Chair shall ensure that a request is made to any identified holders of potential essential patent claim(s) to complete and submit a Letter of Assurance. It is recommended that the WG chair review the guidance in IEEE-SA Standards Board Operations Manual and in FAQs 12 and 12a on inclusion of potential Essential Patent Claims by incorporation or by reference. Note: WG includes Working Groups, Task Groups, and other standards-developing committees with a PAR approved by the IEEE-SA Standards Board. (Optional to be shown) Minyoung Park (Intel Corp.)
12
Participants, Patents, and Duty to Inform
November 2016 Participants, Patents, and Duty to Inform All participants in this meeting have certain obligations under the IEEE-SA Patent Policy. Participants: “Shall inform the IEEE (or cause the IEEE to be informed)” of the identity of each “holder of any potential Essential Patent Claims of which they are personally aware” if the claims are owned or controlled by the participant or the entity the participant is from, employed by, or otherwise represents “Personal awareness” means that the participant “is personally aware that the holder may have a potential Essential Patent Claim,” even if the participant is not personally aware of the specific patents or patent claims “Should inform the IEEE (or cause the IEEE to be informed)” of the identity of “any other holders of such potential Essential Patent Claims” (that is, third parties that are not affiliated with the participant, with the participant’s employer, or with anyone else that the participant is from or otherwise represents) The above does not apply if the patent claim is already the subject of an Accepted Letter of Assurance that applies to the proposed standard(s) under consideration by this group Quoted text excerpted from IEEE-SA Standards Board Bylaws subclause 6.2 Early identification of holders of potential Essential Patent Claims is strongly encouraged No duty to perform a patent search slide_#1 Minyoung Park (Intel Corp.)
13
Patent Related Links Patent Policy is stated in these sources:
November 2016 Patent Related Links All participants should be familiar with their obligations under the IEEE-SA Policies & Procedures for standards development. Patent Policy is stated in these sources: IEEE-SA Standards Boards Bylaws IEEE-SA Standards Board Operations Manual Material about the patent policy is available at If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at or visit This slide set is available at slide_#2 Minyoung Park (Intel Corp.)
14
Call for Potentially Essential Patents
November 2016 Call for Potentially Essential Patents If anyone in this meeting is personally aware of the holder of any patent claims that are potentially essential to implementation of the proposed standard(s) under consideration by this group and that are not already the subject of an Accepted Letter of Assurance: Either speak up now or Provide the chair of this group with the identity of the holder(s) of any and all such claims as soon as possible or Cause an LOA to be submitted slide_#3 Minyoung Park (Intel Corp.)
15
Other Guidelines for IEEE WG Meetings
November 2016 Other Guidelines for IEEE WG Meetings All IEEE-SA standards meetings shall be conducted in compliance with all applicable laws, including antitrust and competition laws. Don’t discuss the interpretation, validity, or essentiality of patents/patent claims. Don’t discuss specific license rates, terms, or conditions. Relative costs, including licensing costs of essential patent claims, of different technical approaches may be discussed in standards development meetings. Technical considerations remain primary focus Don’t discuss or engage in the fixing of product prices, allocation of customers, or division of sales markets. Don’t discuss the status or substance of ongoing or threatened litigation. Don’t be silent if inappropriate topics are discussed … do formally object. See IEEE-SA Standards Board Operations Manual, clause and “Promoting Competition and Innovation: What You Need to Know about the IEEE Standards Association's Antitrust and Competition Policy” for more details. slide_#4 Minyoung Park (Intel Corp.)
16
IEEE-SA policy documents
November 2016 IEEE-SA policy documents IEEE Code of Ethics IEEE Standards Association (IEEE-SA) Affiliation FAQ Antitrust and Competition Policy Letter of Assurance Form IEEE-SA Patent Committee FAQ & Patent slides and Minyoung Park (Intel Corp.)
17
Current IEEE-SA Rule documents
November 2016 Current IEEE-SA Rule documents The current version of the IEEE-SA Standards Board Bylaws is available at: (HTML version) (PDF version) The current version of the IEEE-SA Standards Board Operations Manual is available at: (HTML version) (PDF version) Minyoung Park (Intel Corp.)
18
Current IEEE 802, 802.11 rules documents
November 2016 Current IEEE 802, rules documents IEEE 802 Policies & Procedures (link to AudCom, approved by IEEE-SA Standards Board June 2014) IEEE 802 Operations Manual (13 Nov 2015) IEEE 802 Working Group Policies &Procedures (13 Nov 2015) (editor update) IEEE 802 LMSC Chair's Guidelines (18 Mar 2016) IEEE WG OM: (13 Nov 2015) Policies and Procedures hierarchy IEEE 802 Procedural document website: Minyoung Park (Intel Corp.)
19
November 2016 Reminder of SG Rules The WUR SG operates under the rules defined in the 802 LMSC Policy & Procedures subclause 5.3, 802 LMSC Operations Manual subclause 4.3, and Operations Manual clause 5 Participation is open to all voting rights is NOT required to attend, participate, motion and vote on WUR SG matters All votes on motions require 75% approval to pass Minyoung Park (Intel Corp.)
20
Summary from September 2016 interim meeting
November 2016 Summary from September 2016 interim meeting Completed the development of the PAR and CSD PAR: 11-16/1045r6 CSD: 11-16/936r3 The PAR and CSD contained in 11-16/1045r6 and 11-16/936r3 have been approved by the SG and WG to be posted to the IEEE 802 Executive Committee (EC) agenda for 802 WG preview and EC approval (see the next two slides) Reviewed the presentations (see Slide 23 ) Reviewed the SG timeline Set goals for the November meeting and teleconference schedule Minyoung Park (Intel Corp.)
21
September 2016 doc.: IEEE /1125r1 September 2016 WUR SG PAR approval Believing that the PAR contained in the document referenced below meets IEEE-SA guidelines, Request that the PAR contained in 11-16/1045r6 be posted to the IEEE 802 Executive Committee (EC) agenda for 802 WG preview and EC approval to submit to NesCom. Moved: Minyoung Park Seconded: Osama Aboul-Magd Result: Passes Moved: Shahrnaz Azizi, Seconded: Yunsong Yang, Result: D. Stanley, HP Enterprise John Doe, Some Company
22
September 2016 doc.: IEEE /1125r1 September 2016 WUR CSD approval Believing that the CSD contained in the document referenced below meets IEEE 802 guidelines, Request that the CSD contained in 11-16/936r3 be posted to the IEEE 802 Executive Committee (EC) agenda for 802 WG preview and EC approval. Moved: Minyoung Park Seconded: Osama Aboul-Magd Result: Passes Moved: Osama Aboul-Magd, Seconded: Yunsong Yang, Result: D. Stanley, HP Enterprise John Doe, Some Company
23
Submissions Reviewed in September 2016
November 2016 Submissions Reviewed in September 2016 PAR related submissions: 11-16/1229r0, WUR update on PAR comment resolution, Shahrnaz Azizi (Intel) 11-16/1045r4, A PAR proposal for WUR SG, Shahrnaz Azizi (Intel) CSD related submissions: 11-16/936r2, A CSD proposal for wake-up radio (WUR), Osama Aboul-Magd (Huawei) Other submissions: 11-16/1144r0, Further investigation on WUR performance, Eunsung Park (LGE) 11-16/1147r0, WUR and efficiency tradeoffs (Newracom) 11-16/1215r0, Demand of Being Waken Up While Moving Follow-up, Ke Yao (ZTE) 11-16/1217r0, WUR based Broadcast Reference Signal, John Son (WILUS) 11-16/1243r0, Multi user access for Wakeup Radio, Hanseul Hong (Yonsei Univ.) Minyoung Park (Intel Corp.)
24
November 2016 Motion - Minutes Approve WUR SG minutes of September 2016 meeting [doc: IEEE /1248r0] Move: Second: Result: Minyoung Park (Intel Corp.)
25
November 2016 Review and Resolve Comments from Other WGs and EC on the PAR and CSD Documents Review the comments from other WGs and EC Resolve the comments Revise the PAR and CSD documents Approve the revised PAR and CSD documents Minyoung Park (Intel Corp.)
26
November 2016 Motion - PAR Believing that the PAR contained in the document referenced below meets IEEE-SA guidelines, Request that the PAR contained in [doc: /1045r9] be submitted to the IEEE WG approval and submit to IEEE 802 EC for approval to submit to NesCom. Moved:, Shahrnaz Azizi Seconded:Leif Wilhelmsson Result: Y: 34, N: 0, A: 1 Minyoung Park (Intel Corp.)
27
November 2016 Motion - CSD Believing that the CSD contained in the document referenced below meets IEEE 802 guidelines, Request that the CSD contained in [doc: /936r4] be submitted to the IEEE WG approval and submit to IEEE 802 EC for approval. Moved:, Yongho Seok Seconded:, Bin Tian Result: Y: 28, N:0, A:0 Minyoung Park (Intel Corp.)
28
Motion: Study Group Extension
July 2016 Motion: Study Group Extension Request the IEEE 802 LMSC to extend the IEEE Wake-up Radio Study Group (WUR SG) [Moved by <name> on behalf of <group>] WUR Study Group vote: Move: Second: Results: Y/N/A Minyoung Park (Intel Corp.)
29
WUR SG Timeline November 2016 July 2016 (plenary)
Develop PAR and CSD Study Group extension (August teleconference calls) September 2016 (interim) SG/WG approval on PAR and CSD (October teleconference calls) Cancelled November 2016 (plenary) Receive comments from other WGs and EC members on or before Tuesday 6:30pm Resolve the comments before the WG mid-week plenary meeting on Wednesday EC approval on PAR and CSD Study Group extension (December 2016 – teleconference calls) NesCom approval January 2017 (interim) Task Group formation meeting Minyoung Park (Intel Corp.)
30
November 2016 Goal for January 2016 TBD Minyoung Park (Intel Corp.)
31
Teleconference Call Schedule
November 2016 Teleconference Call Schedule TBD Minyoung Park (Intel Corp.)
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.