New Hangar and Storage Shed Design at Burlington International Airport Senior Capstone Design Project Civil and Environmental Engineering University of Vermont Erin Flynn and Phillip Peterson Presenting
2
Overview Working with Heather Kendrew and Robert McEwing at the Burlington Airport as part of service-learning project.
3
Teams Team 1: Site preparation, demolition/deconstruction of existing buildings Team 2: Equipment and chemical storage facility layout and design Team 3: New Hangar layout and design
4
Site Overview
5
Pavement Removal Slab Removal Silt Fences and Erosion Control Team 1: SITE PREPARATION
6
Demolition -Existing Conditions -Salvage and Recycling of Building Materials -Demolition Procedure -Demolition Costs -Demolition Permits
7
Team 2: Storage Facility Existing Building 870
8
Site Plan & Building Layout Existing structures and utilities, overlay (shaded area) of the proposed storage facility
9
Interior layout of proposed storage facility
10
Radiant Floor Heating System
11
Team 3 Hangar Design Existing hangar – 40,000 sqft
12
New Hangar 70,000 sqft
13
Structural Design
15
Sliding Hangar Door No part of the door weight is supported by the building frame Door is carried by ASCE certified Crane Rails Door is guided by top rollers that travel on overhead guides Can be customized to almost any size
16
Building Layout Oil-water separator Drainage
17
Water Main
18
Summary Storage Shed and New Hangar Design Storage Shed Pre-Fab Hangar Original Design