Download presentation
Presentation is loading. Please wait.
Published byNathanial Haith Modified over 10 years ago
1
High Resolution DEM Creation for Majuro Airport
Elizabeth Lomani MarTina Corporation
2
Airport Background Majuro, Marshall Islands Elevation: 2 meters
Max Runway: 2407 x 46 meters Accommodate 25 flights per week International flights Cargo flights Domestic flights Important infrastructures Airport Water catchment for the island
3
Important infrastructures
Pipelines Reservoir Airport
4
Steps to Creating the Airport DEM
Results from topographic survey Convert DXF to GIS format Digitised spot heights Export to Access for data integrity checks Export to Erdas DTM creation in Erdas
5
Convert DXF to GIS format
Too many files to go through. Opening files proved to be tedious and time consuming
6
Digitising spot heights
Contour lines without elevation values Extracting elevation values from original file More than one feature on one file 1 2 3
7
Result of Digitising 5 people digitised the spot heights
14,000 points digitised 10,00 points - useful
8
Export to Access for data integrity checks
Null Values Unrealistic heights Conversion from feet to meters
9
DTM Creation Surface model was created
Holes in the middle of the airport Negative values Typos
10
2030 Sea level rise inundation model
16cm sea level rise Spatial Analysis Area loss 20% Infrastructure affected
11
2055 Sea level rise inundation model
30cm sea level rise Spatial Analysis Area loss 50% Infrastructures affected
12
2090 inundation model 60cm sea level rise Spatial Analysis Area loss
More than 90% Infrastructures affected
13
Thanks
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.