Cormac Engineering Zambia Limited The Finance and Construction of 12 Airports For The Republic of Zambia Presented by Steve Pearson Programme Director.

Similar presentations


Presentation on theme: "Cormac Engineering Zambia Limited The Finance and Construction of 12 Airports For The Republic of Zambia Presented by Steve Pearson Programme Director."— Presentation transcript:

1 Cormac Engineering Zambia Limited The Finance and Construction of 12 Airports For The Republic of Zambia Presented by Steve Pearson Programme Director Page 1 of 19

2 Cormac Engineering Zambia Limited Presented by Steve Pearson Programme DirectorPage 2 of 19

3 Endorsed by African Regional High Commissions: Leadership and Consultation; Providing High Tier Management in Infrastructure Development. Setting the standards for Quality and Technology Development. High Quality Engineering Expert Implementation; Value Added construction solutions. Long lasting environmental and humanitarian benefits. Sharing your Vision in Partnership; We will develop solutions to achieve your objectives. Cormac Engineering Zambia Limited Presented by Steve Pearson Programme DirectorPage 3 of 19

4 Our Accolades: Cormac Limited understands the infrastructure requirements of African countries Customer focused and we aim to exceed all expectations Adaptive approach to development phasing and requirements Provision of economies of scale to benefit project and programme implementation. Cormac Engineering Zambia Limited Presented by Steve Pearson Programme Director Page 4 of 19

5 Client: Metropolitan Washington Airports Authority President Ronald Reagan International Airport Contract Period: April 2011 – March 2012 Contract Value: £8.7 million =========================================================== Client: Sierra Leone Airport Authority Lungi International Airport Contract Period: April 2010 – April 2011 Contract Value: £8 million Portfolio Examples Cormac Engineering Zambia Limited Presented by Steve Pearson Programme Director Page 5 of 19

6 Client: Namibia Airports Company (NAC) Hosea Kutako International Airport Contract Period: September 2012 - July 2013 Contract Value: US $ 3.5 million ====================================================== Client: Ilembe Consortium King Shaka International Airport Contract Period: Jun 2006 - Apr 2010 Contract Value: $ 45million Portfolio Examples Cormac Engineering Zambia Limited Presented by Steve Pearson Programme DirectorPage 6 of 19

7 Airports Team Cormac Engineering Zambia Limited Presented by Steve Pearson Programme DirectorPage 7 of 19

8 Outline of Aerodromes Aerodromes NakondeCat 3International ChomaCat 4International KitweCat 4Domestic ChingolaCat 4Domestic MufuliraCat 4Domestic LuanshyaCat 4Domestic SamfyaCat 3Domestic ZambeziCat 4Domestic KabweCat 4Domestic KateteCat 4Domestic PetaukeCat 3Domestic KalaboCat 3Domestic Cormac Engineering Zambia Limited Presented by Steve Pearson Programme Director Page 8 of 19

9 List of Services and Deliverables Engineering & Design Phase Topological And Geotechnical Survey Boundary Security Construction Drawings Airfield Pavement Design Construction Drawings Service Pavement Design Construction Drawings Car Park Ticket Revenue Design Drawings Airfield Ground Lighting Design Drawings Capacity Assessments Airport Master Plan Development Cormac Engineering Zambia Limited Presented by Steve Pearson Programme DirectorPage 9 of 19

10 List of Services and Deliverables Construct Construction of Runways, Taxiways, Aprons Lighting, Signage, Safety Airport Access Roads Car Parks Cormac Engineering Zambia Limited Construction Phase 1 - Overview Implementation of Boundary Security Implementation of Runway, Taxiway and RESA Pavements Implementation of Apron Pavements Implementation of Car Park Pavements & Ticket Systems Implementation of Access Road Pavements Implementation of Airfield Ground Lighting Implementation of Airfield Signage Presented by Steve Pearson Programme DirectorPage 10 of 19

11 List of Services and Deliverables Construct Construction of Runways, Taxiways, Aprons Lighting, Signage, Safety Airport Access Roads Car Parks Cormac Engineering Zambia Limited Construction Phase 1 - Airfield Pavements Asphalt Pavements at ~ 3ft depth: Runways: Total 22.4 Km Asphalt Taxiways: Total 1.8 Km Asphalt RESAs: Total 72,000 m2 Asphalt RESAs: Total 28,800 m2 Non-Asphalt Concrete Pavements at ~ 3.5 ft depth: Aprons: Total 230,958 m2 Concrete Presented by Steve Pearson Programme DirectorPage 11 of 19

12 List of Services and Deliverables Construct Construction of Runways, Taxiways, Aprons Lighting, Signage, Safety Airport Access Roads Car Parks Cormac Engineering Zambia Limited Construction Phase 1 - Service Facilities Asphalt Pavements: Car Parks: Total 133,650 m2 Access Roads: Total 20.98 Km Car Parking Systems: 4 Parking systems each comprising: 2 Automated Entrance 2 Automated Exit 2 Automated Payment Machines Presented by Steve Pearson Programme DirectorPage 12 of 19

13 Terminal, Tower, Fuel Farm Areas – Phase 2 Terminal Design and Construction ATC Tower Design and Construction Mechanical Systems Fit out Electrical Distribution HVAC Lighting and Signage Baggage Handling Security Screening Immigration and Transit Areas Arrivals and Departure areas / lounges Fuel Farms and Fire Fighting Facilities Building Facilities Cormac Engineering Zambia Limited Presented by Steve Pearson Programme DirectorPage 13 of 19

14 Communications Communications Systems – Phase 2 ATC VHF Communication Systems Ground Management Communications Crash Fire Rescue Communications Intercom and Public Address Systems Digital Voice Switch Systems Cormac Engineering Zambia Limited Presented by Steve Pearson Programme DirectorPage 14 of 19

15 Surveillance Surveillance Systems – Phase 2 Time Reference Systems Meteorological Systems Record and Replay Systems Time Stamping Systems Cormac Engineering Zambia Limited Presented by Steve Pearson Programme DirectorPage 15 of 19

16 Navigation Navigation Systems – Phase 3 VHF Omnidirectional Range System (VOR) Instrument Landing Systems (ILS) Approach Lighting Runway Centre Line Lighting Cormac Engineering Zambia Limited Presented by Steve Pearson Programme DirectorPage 16 of 19

17 Commercial: Engineering Design and Construction Phase 1: Financed Programme dependant on arrangement Two Year Six Month Programme to completion Programme Price $143, 278, 742 US Dollars Programme Down Payment of 30% Runway Price (per Km) $2, 600 000 or < 20m Kw Cormac Engineering Zambia Limited Presented by Steve Pearson Programme DirectorPage 17 of 19

18 Conclusions: Dependable Airport Expertise Proven Airport Programmes Flexible approach to Clients needs Tailored solutions Cost-effective phased approach Cormac Engineering Zambia Limited Presented by Steve Pearson Programme DirectorPage 18 of 19

19 Thank you for your valuable time! Any Questions? Cormac Engineering Zambia Limited Presented by Steve Pearson Programme DirectorPage 19 of 19