Download presentation
Presentation is loading. Please wait.
1
From STAB teleconference minutes
The conclusion of the meeting was to recommend the following work plan: CCP4i-classic A new version of the CCP4i should be released to users at the end of each of the three steps below: Reorganisation of the existing tasks to make them more understandable as a pathway to structure solution for users and particularly students. The new organisation of the tasks is almost ready for release. 2. Reorganisation of the database along the lines being developed by Wendy at the moment. It is anticipated that this will take approximately 6 months. 3. Feedback between CCP4mg/Coot and the non-graphical software and the database. This will require substantial new code development, and is about 18 months away from release. At the end of this work the CCP4i-classic should be left in good shape to enable it to be maintained but not undergo further development.
2
CCP4i-auto Work should begin now in considering options for the look-and-feel of a new CCP4i that is designed for greater automation of crystallography. Initially, the mosflm GUI could be used as a template for development, although several different models will probably need to be taken forward for user trials before one is chosen. It is expected that the lag time for the development of this GUI may be several years, and it is therefore important that the Executive consider what resources should be allocated to this project as soon as possible.
3
CCP4i auto – main requirements
simple and intuitive interface live progression window with graphs two-way communication with the user (wizard function) report generation direct access to molecular graphics programs when needed portability others?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.