Average roller passes across traffic lane
DATE TANDEM PTR 25TH MAY 7 9 8 26TH MAY 4 3 27TH MAY 5 6 1ST JUNE 2ND JUNE 3RD JUNE HD O 90 V 3RD JUNE HD 70 4TH HD O 90 V 4TH HD 70 SASOBIT REDISET Control Mix D + 10% RA
2
Average number of roller passes per section
DATE TANDEM PTR TOTAL COMPACTION 25TH MAY 8 9 17 26TH MAY 4 13 Bomag 27TH MAY 6 10 1ST JUNE 5 2ND JUNE 7 3RD JUNE HD O 90 V 6* 13* 3RD JUNE HD 70 11* Hamm 4TH HD O 90 V 15 4TH HD 70 12 * assumed PTR passes SASOBIT REDISET Control Mix D + 10% RA
3
Ranking based on total number of roller passes
DATE TANDEM PTR TOTAL COMPACTION 1ST JUNE 5 10 Bomag 27TH MAY 4 6 3RD JUNE HD 70 6* 11* Hamm 4TH JUNE HD 70 12 3RD JUNE HD O 90 V 7 13* 2ND JUNE 13 26TH MAY 9 4TH HD O 90 V 8 15 25TH MAY 17 * assumed PTR passes SASOBIT REDISET Control Mix D + 10% RA
4
Ranking based on tandem roller passes
DATE PASSES COMPACTION 27TH MAY 4 Bomag 26TH MAY 1ST JUNE 5 3RD JUNE HD 70 Hamm HD 70 4TH JUNE HD 70 6 3RD JUNE HD O 90 V 7 Hamm HD O 90 2ND JUNE 4TH HD O 90 V 8 25TH MAY
5
26 MAY MIX D + 10% RA CONTROL SECTION
RIGHT LANE SOUTH BOUND C/W Tandem roller achieved < 90% compaction. Required compaction achieved using PTR
6
27 MAY WMA MIX D + 10% RA + 1.5% SASOBIT
LEFT LANE SOUTH BOUND C/W 92% compaction achieved between 4 & 5 tandem roller passes at 2 of 3 test positions. Required compaction achieved using PTR.
7
27 MAY WMA MIX D + 10% RA + 1.5% SASOBIT
RIGHT LANE SOUTH BOUND C/W 92% compaction achieved after 6 tandem roller passes in 1 of 3 test positions. Required compaction achieved using PTR.
8
1 JUNE WMA MIX D + 10% RA + 2.0% REDISET
LEFT LANE SOUTH BOUND C/W % compaction achieved after 3 to 5 tandem roller passes at all 4 test positions. Required compaction achieved using PTR.
9
1 JUNE WMA MIX D + 10% RA + 2.0% REDISET
RIGHT LANE SOUTH BOUND C/W 92% compaction achieved after 3 to 5 tandem roller passes at all 3 test positions
10
2 JUNE WMA MIX D + 10% RA + 2.0% REDISET
NORTH BOUND C/W LEFT LANE 92% compaction achieved after 5 to 8 tandem roller passes at all 3 test positions
11
2 JUNE WMA MIX D + 10% RA + 2.0% REDISET
NORTH BOUND C/W RIGHT LANE 92% compaction achieved after 5 to 8 tandem roller passes at all 3 test positions
12
3 JUNE WMA MIX D + 10% RA + 1.5% SASOBIT
NORTH BOUND C/W LEFT LANE 92% compaction achieved after 4 to 5 tandem roller passes at all 3 test positions
13
3 JUNE WMA MIX D + 10% RA + 1.5% SASOBIT NORTH BOUND C/W LEFT LANE
92% compaction achieved after 4 to 8 tandem roller passes at 4 of 5 test positions, < 92% at one position
14
4 JUNE MIX D + 10% RA CONTROL NORTH BOUND C/W LEFT LANE < 92% compaction achieved using tandem roller at both test positions. Required compaction achieved using PTR
15
4 JUNE MIX D + 10% CONTROL NORTH BOUND C/W RIGHT LANE
92% compaction achieved using tandem roller at one out of 4 test positions, < 92% at the 3 other positions. Required compaction achieved using PTR.