Download presentation
Presentation is loading. Please wait.
1
NWP activities in Austria in 2006/2007 Y. Wang
2
ALADIN-Austria: operational
Model System: ALADIN CY32 (ALARO version) since Sept. 2007 9.6km horizontal resolution, 45 levels in vertical Introduction of micro-physics. 4 runs at 00, 06, 12, 18UTC. Forecast integration up to 60h and 72h. Computer System: NEC SX-8R 16 CPU since Feb. 2007
3
ALADIN-LAEF: operational
ALADIN-LAEF (Limited Area Ensemble Forecasting) : ALADIN downscaling of 16 ECMWF EPS members 18km horizontal resolution, 37vertical levels 2 runs per day at 00 and 12UTC, forecast up to 54h
4
Recent and ongoing R & D:
Nowcasting INCA ALADIN-LAEF Implementation and validation of ALADIN 3D-VAR Study on precipitation forecast over mountain with AROME International projects
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.