Download presentation
Presentation is loading. Please wait.
Published byBria Keightley Modified over 10 years ago
1
Development of Regional Aviation in Russia 2009 Copyright CorganDyer 2009
2
Anglo-American design company Main offices in London, Dallas and Moscow 300 employees Fully licensed to trade in Russia Full range of architectural and engineering design services provided
3
Current project locations in Russia..... Moscow Nizhny Novgorod Cheboksary Saratov Volgograd Krasnodar Sochi Omsk Orel Voronezh Ufa Perm
4
Selected Client List Aer Lingus Air France Air India Alitalia Airlines American Airlines Asiana Airlines British Airways BAA Continental Airlines DFW International Airport Detroit Metro Int. Airport Delta Airlines Egypt Air We offer a multitude of design services that meet rigorous aviation demands Airport Planning Terminal Design Airport Facilities Airline Facilities Frontier Airlines Japan Airlines JFK International Airport KLM Korean Air Miami International Airport Northwest Airlines Sabena Airlines Southwest Airlines Swiss Air Turin/Casella Airport United Airlines
5
Principles for success in regional airport projects - Operational-based, flight schedule driven, briefing Adherence to business plan objectives Defining, and then meeting, or exceeding customer service standards Comprehensive integration of technical systems, including; building services, baggage, security, communications and data systems Commitment to development and implementation of effective security systems and processes Design excellence
6
Description: This facility provides 600,000 SF of new construction including 23 new swing gates for Continental Airlines. The new terminal is a three level, dual pier arrangement which provides independent operations at each gate position. Location: Houston, Texas Completed Date: July 2004 Cost: $200,000,000+ TERMINAL E GEORGE BUSH INTERCONTINENTAL
7
TERMINAL D DFW INTERNATIONAL AIRPORT Description: DFW International Airport developed a new 2 Million SF terminal to house all international operations. The terminal includes: Two Ticketing Halls, Concourses, Concession Areas, A Customs Hall, Bag Claim Areas, Airline Clubs, Automated People Mover Stations, and an Integrated 300-Room Hotel. Location: DFW Airport, Texas Completed Date: 2005 Cost: $753,000,000
8
MAYNARD H. JACKSON INTERNATIONAL TERMINAL Description: The new terminal will provide supplemental international passenger processing capability through a 16-gate international terminal served by a new landside terminal roadway system and garage. It will connect with the existing terminal and concourses by way of a people-mover extension and multiple passenger walkways. Location: Atlanta, Georgia Completed Date: In Progress Cost: $790,000,000
9
TERMINAL EXPANSION CHANGSHA, CHINA Description: This facility provides 1.25 million new SF to Chinas Changsha Airport. The terminal expansion includes: 6 additional international and 22 domestic gates with ticketing, bag claim and international passenger processing capacity. Location: Changsha, China
10
LOVE FIELD TERMINAL MODERNIZATION PROGRAM Description: The project includes the replacement of the 3 existing concourses with one single new concourse, constructed in a phased manner to preserve active gate count. The existing Terminal building and bag claim hall will be heavily renovated, and the ticketing wing will be replaced. The final Terminal configuration will include approximately 750,000 SF and will accommodate 20 narrow body gates. Location: Dallas, Texas Completed Date: In Progress Cost: $500,000,000+
11
DELTA AIR LINES ATO RENOVATION HARSTFIELD-JACKSON Description: A new, open plan for the ticketing hall and ATO support offices improves intuitive way finding and also creates room for ticket queuing. The new layout increases exposure to concessions and improves passenger flow through three additional security checkpoint lanes. Location: Atlanta, Georgia Completed Date: July 2007 Cost: $220,000,000
12
DFW AIRPORT CONSOLIDATED RENTAL CAR FACILITY Description: To accommodate the rapid growth of rental companies, the new facility was designed to house 11 companies, with planned expansion on the ground level. The new 24-hour facility includes a two-story, 1.4 M SF parking structure which accommodates 5,000 cars and a 16,000 SF six bay bus maintenance facility. Also there are 11 exclusive use service facilities independent of the main building where each of the rental car companies wash and prepare their vehicles, and perform light maintenance. Location: Dallas, Texas Completed Date: 2001 Cost: $142,000,000+
13
AMERICAN AIRLINES AIRCRAFT MAINTENANCE HANGAR Description: This C-Check Maintenance Hangar built at Alliance Field totals 780,000 SF and is the largest cantilevered hangar in the world. It is capable of simultaneously servicing seven aircraft. Combinations include Boeing 767 and 757, Airbus A300, and McDonnell Douglas MD-11 airframes. The hangar has a 260 foot, clear-span cantilever structure free of interior columns and is designed to accommodate the addition of three future bays. Location: Fort Worth, Texas Cost: $90,000,000
14
Mixed Use Development, Voronezh
15
Mixed Use Development Zhukovsky
16
We can help deliver your vision…. Masterplanning Concept Design Proekt Design Project Delivery
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.