STABILIZING BRIDGE BANKS FROM SOIL EROSION ON THE TOK AND RICHARDSON HWY WITH CHEMICAL GROUT PRESENTER: Paul ”Capt. Grout” Layman
2
Pieces of the Puzzle Single Epoxy or Plural Acrylic Phobic Acrylates
Urethane Silicates Single or Plural Epoxy Acrylic Phobic Philic Acrylamide
3
Geo Information
4
Layout Pattern
5
Area To Be Permeated (Grouted)
6
Area To Be Permeated (Grouted)
7
Grouting Procedure Completed
8
Heated Workstation
9
Road Bed Layout
10
Road Bed Layout (Water and Grout Injection)
11
Checking Our Takes
12
The End