Presentation is loading. Please wait.

Presentation is loading. Please wait.

Fulvio Lecci Link It Program Manager Technical Area - ENAV Link2000+ Workshop – Brussels 10, 11 October 2007.

Similar presentations


Presentation on theme: "Fulvio Lecci Link It Program Manager Technical Area - ENAV Link2000+ Workshop – Brussels 10, 11 October 2007."— Presentation transcript:

1 Fulvio Lecci Link It Program Manager Technical Area - ENAV Link2000+ Workshop – Brussels 10, 11 October 2007

2 2 10 th october 2007 - Brussels The approach to data link ENAV commitment In 2001 ENAV decided to commit to Link2000+ Initial studies to define basilar requirements Designed Airspace Network ownership Data Link Approach Business Case to demonstrate data link feasibility Safety Assessment process FTS, Data Link HMI Definition & Prototyping Operational Implementation

3 3 10 th october 2007 - Brussels Designed Airspace UIR Roma (FL290 – 460) UIR Milano (FL296 – 460) Managed by Roma ACC

4 4 10 th october 2007 - Brussels Safety Assessment steps Operational environment and related services Functional Hazard Assessment to identify risk level of the new functionalities CPDLC HMI Functional Requirements Functional Requirements Document for the use of L2k+ baseline services (DLIC,ACM,ACL,AMC) Safety Assessment process

5 5 10 th october 2007 - Brussels Data Link HMI Definition & Prototyping Prototype of a new Human Machine Interface Related working methods for the use of the datalink services Based on the one currently in operation in Rome ACC Efficiency Analysis Analyse the impact of data link communications on ATCOs Workload. Definition and validation of new controllers tasks by Real Time simulations. Safety Objectives Validation Specific Safety Scenarios were developed and injected in the RTS Validation of FHA Safety Objectives compliance with the Hazards identified in the FHA and in the ED120 FTS/RTS: step by step approach

6 6 10 th october 2007 - Brussels Innovative Control Working Position solutions supporting Data Link services for testing CPDLC operations FTS/RTS: HMI prototyping ACL message: authorized to level … (UM19, UM20, UM21) AB button on ALV or Modo C field label: ALV menu to send clearances. AB button on clearance level of right column (DL mode): DL message will be sent. In the label a yellow frame will close ALV field. Pilot has receveid clearance. Pilot will answer WILCO. When WILCO message will be received from system, yellow frame around ALV field get off.

7 7 10 th october 2007 - Brussels 2 2 Real Time Simulation (Human-in-the-loop) and 1 Fast Time Simulation ( SICTA and ENAV Experimental Centre ) 1 st Real Time 1 st Real Time Simulation exercise aiming to define and evaluate new controllers tasks (qualitative and quantitative approach), to feed FTS A Fast Time Simulation exercise to evaluate the efficiency and the potential increase of sectors capacity, based on preliminary indications from 1 st RTS 2 nd Real Time 2 nd Real Time Simulation exercise to evaluate Safety and Human Factors aspects FTS/RTS: main activities

8 8 10 th october 2007 - Brussels Constant decrease of workload in each of future (CPDLC) scenario Progressive and regular decrease of the voice communications amount Decrease of time duration of voice communication Increase of Sectors Capacity up to 12.8% (with 100% of traffic D/L equipped). The different results in term of capacity depend on the typology of Sectors (e.g. Feeder of Roma TMA) and the characteristic of traffic (e.g. overfly) Slight reduction of improvement margins in case of non-nominal scenario FTS/RTS: main results of FTS

9 9 10 th october 2007 - Brussels FTS/RTS: evidence of results of FTS

10 10 10 th october 2007 - Brussels Airspace Environment Airspace Environment 2 sectors (EWU & OVS) 2 sectors (EWU & OVS) 2 Feeder (Marsiglia/Tunusi as other ATSU and Roma ACC as sector of same ATSU) 2 Feeder (Marsiglia/Tunusi as other ATSU and Roma ACC as sector of same ATSU) Traffic Sample Traffic Sample 3 levels of traffic (75%, 100% & 130% of sector capacity as reported to CFMU) 3 levels of traffic (75%, 100% & 130% of sector capacity as reported to CFMU) 2 percentage of aircraft D/L equipped (50% & 75%) 2 percentage of aircraft D/L equipped (50% & 75%) ATC Working Methods ATC Working Methods Baseline (R/T modality) Baseline (R/T modality) Baseline + CPDLC modality Baseline + CPDLC modality Baseline + CPDLC modality with task sharing between EXE & PLN Baseline + CPDLC modality with task sharing between EXE & PLN Organizations Organizations 23 exercises with 8 ATCO in rotation 23 exercises with 8 ATCO in rotation Non-Nominal Events Non-Nominal Events : Military Area and Bed Weather Conditions Faults Injections (e.g. Misdirection of message, corruption of message) Faults Injections (e.g. Misdirection of message, corruption of message) FTS/RTS: human in the loop simulations

11 11 10 th october 2007 - Brussels FTS/RTS: Roma ACC sectors Feeder East Roma ACC Feeder West Marsiglia/Tunisi

12 12 10 th october 2007 - Brussels Over the Shoulders Observation Safety & Human Factors Experts Questionnaires Human Factors post run (based on NASA TLX and SASHA) Human Factors Survey Safety post run Personal Interview Instantaneous Self Assessment (ISA) Debriefing post run Debriefing post simulation sessions Eye Tracking The map of hot-spot shows the areas which are mostly fixed by ATCO during a run FTS/RTS: evaluation activities

13 13 10 th october 2007 - Brussels FHA Safety Objective Validation Identification and evaluation of the effects of Hazards on the basis of ATCO behaviours and feedback Evalutation of the effective risk related to more critical Hazards (e.g. Misdirection of message, Corruption of Flight Level message) Supported by proof the Severity of Operational Consequences and the Safety Objectives derived from the FHA Identification of some mitigation means to apply in design and implementation of new HMI FTS/RTS: output of SO validation

14 14 10 th october 2007 - Brussels Measurement of workload through the Instantaneous Self Assessment Compared the Baseline scenario (R/T modality) with the D/L scenario (R/T + CPDLC modality) Evident reduction of workload in the organizations with CPDLC FTS/RTS: evidence of results of ISA

15 15 10 th october 2007 - Brussels Human Factors Trust of ATCO in the CPDLC Significant reduction of workload and voice communications Increase of Situational Awareness Positive ATCO feedback on HMI usability FTS/RTS: main results of RTS

16 16 10 th october 2007 - Brussels Contract objectives Implementation of DLIC, ACM, ACL, AMC Initial CPDLC services will be implement in Roma ACC using VDL2 network Implementation of data link network A new network supporting VDL2, AOA, ACARS protocol will be developed and implemented Implementation of D-ATIS and DCL D-ATIS and DCL will be implement in Fiumicino and Malpensa airport using ACARS protocol Operational Implementation

17 17 10 th october 2007 - Brussels Implementation Phases Definition, Testing, Implementation of Multimode Ground Station New VHF, VDL, ACARS Ground Station to manage ATS and AOC messages. Partnership Agreement with ARINC. Implementation of data link network Network of initial 10 MGS to cover Roma UIR and most important airport, starting from Fiumicino and Malpensa. MGS will be connected together and integrated in ENAV network using E-Net transport services (ENAV program to implement ATM network connections) Upgrade of the HMI Data link new functionality will be implement in operational HMI used in Roma ACC. Pre-operational phase in PSA Pre-operational phase will be performed in PSA of Roma ACC (Test, Simulation and training room) Assess operational validation of CPDLC services. Training sessions for controllers. Operational phase CPDLC services will be implement in Upper sectors managed by Roma ACC. Operational Implementation

18 18 10 th october 2007 - Brussels Timing of data link implementation Operational Implementation 08 09 07 10 11 Project Definition Development and testing of MGS System and Network Implementation Operational Rome UIR Pre-Operational Phase in Rome PSA Pre-Operational phase in Fiumicino & Malpensa Operational phase in Fiumicino & Malpensa Other airport and ACCs

19 19 10 th october 2007 - Brussels Operational Implementation


Download ppt "Fulvio Lecci Link It Program Manager Technical Area - ENAV Link2000+ Workshop – Brussels 10, 11 October 2007."

Similar presentations


Ads by Google