Presenters: Sergio Rodriguez, EAS Operations Manager | Kitchell CEM
Rob Harris, Principal Engineer | County of Ventura, GSA Facilities and Materials – Maintenance Division
2
What is a FCA? Why is a FCA Important? “Property” Condition Assessment
Specific point in time Why is a FCA Important? Facilities management is a numbers game! What is your number? Do your facilities support your agency’s mission? How much is the total cost of operation? Rob’s Notes: Our clients see the exterior: ceiling, landscape, painting They comment We respond with pleasing projects But what about the heart and lungs of your facilities? Does your board know the whole story?
3
KITCHELL EXPERIENCE
4
KITCHELL EXPERIENCE Goals and Objectives Maintenance Questionnaire
Receipt of all Documentation Review Prioritization Categories Review Report Format Maintenance Questionnaire Pre-Assessment Meeting Client Responsibilities Client Sensitive Issues **FOCUS MORE ON BOLD BULLETS
5
KITCHELL EXPERIENCE What are Your Goals?
User defined with consultants’ help Current condition of facilities’ equipment and sub-assets Renewal schedule for 5, 10, 20 year forecast Document for Board level discussions on funding needs Long list; what do you do? Prioritization of projects Time line and horizon Recommended funding scenarios ROB’S SLIDE NUMBER 4 & PRIORITIZATION OF RQM PROJECTS
6
Operational Efficiency (5)
KITCHELL EXPERIENCE Potential danger to life or property Emergency (1) Compliance with legal, regulatory requirements Life / Safety concerns Safety (2) Initiatives consistent with strategic plan Input from BOS, County staff, citizens Mission (3) Operating and Maintenance Costs Preservation of existing assets Preventive (4) Space utilization Consolidation of services Cost vs. benefit Rental reimbursement compared to depreciation recapture Operational Efficiency (5) i.e. Painting, carpeting, ceiling tiles Appearance (6) Rob’s slide
7
KITCHELL EXPERIENCE FCA Considerations
How will the assessment data be used? Prioritization Methodology Quantification of Deficiencies Uniformat Categorization Cost Data Source Cost Escalation CIP Cycle Maintenance Planning
8
KITCHELL EXPERIENCE Field Assessment Team ASTM E2018-15
Means of Data Collection Asset Tagging Notifying Owner of Fire/Life Safety Issues *FOCUS ON LAST TWO BULLETS
9
KITCHELL EXPERIENCE Quantified Cost Data
Fire and Life Safety Analysis ADA Compliance Seismic Evaluations Energy and Sustainability Opportunities Life Cycle Analysis Understanding How Data will be Uploaded Focus on BOLD bullets
10
KITCHELL EXPERIENCE High Quality and Usable Data Pilot Report
Capital Improvement Projects Maintenance Recommendations Pilot Report Quality Control Procedures Communication Focus on BOLD bullets
11
KITCHELL EXPERIENCE Asset Tagging Preventive Maintenance Plans CMMS
13
KITCHELL EXPERIENCE CMMS Evaluation Current Utilization
Process Evaluation & Recommendations Digital User Manual CMMS Training Videos
14
Don’t disregard the message because its bad
Other cost factors associated with correcting a deficiency (i.e., carpet replacement; relocating employees, swing space, moving/lifting furniture, etc.; permitting costs; soft costs (staff time)). If assets are not barcoded, included barcoding assets in scope of work and tie findings to asset barcodes. Executive summary should be about the general condition of the building, not an itemized list of the findings in a narrative format. Reports should include a general floor plan and/or site plan of the facility that ties findings to locations. Understand your buildings were built BEFORE most of the current technologies Don’t disregard the message because its bad Don’t change your Metrix to explain the numbers you want to see Information is like cheese, if you leave it on the shelf its going to start to stink Don’t wait for a magic pill to take care of all of the problems Select Lessons Learned from Leonard Pinson, Project Manager for San Diego County FCAs and Things to Consider from Shelby at SLO County
15
KITCHELL EXPERIENCE Selection Solicitation Scoring Interviews
RFP Development Goals? CMMS connection? Facilities selection from portfolio We selected buildings over 20 K SF for 1st phase Lessons learned from others / example contracts Solicitation Who do send it to? (research) RFP review / job walk Scoring Criteria? Cost Adherence to contract terms FCA methodology Qualifications Interviews Why should we pick you? Selection