Download presentation
Presentation is loading. Please wait.
1
End-to-End Internet Delay Behavior
RIIT Security Lab P2P Subgroup Jan. 2006
2
Outline Data Set Math Model Delay Predicting
Delay Heuristic Information Conclusion 2019/7/9
3
PlanetLab Large scale and geographically distributed open testbed under real-world conditions Timeline 2002 Dec. 2004-CERNET Nov. 2005 More than 600 Nodes Near 300 sites Over 25 countries More than 275 research projects 2019/7/9
4
Diversity of PlanetLab
Sep. 28th 2005 2019/7/9
5
PlanetLab All Pairs Pings (PAPP)
Feb MIT Every PlanetLab Node performs a batch of ping against each other at an interval of 15 minutes Each batch stops after 10 RTT being collected or timeout in 2 minute; minimum, average, and maximum is stored Data are collected by a server located at MIT every an hour, and are archived on the basis of a quarter Time IP List RTT Matrix 2019/7/9
6
Data Set Jun. 1st, 2005 ~Aug. 31th, 2005 8813 Samples 478 Nodes
1,400,000,000 RTTs 2019/7/9
7
Methodology Can Average RTT represents RTT in an interval? 2019/7/9
8
Methodology Does Sample Interval affect our results?
(a) 200ms (b) 1s (c) 5s End to End Delay in Dec. 23th, 2005 within 30 minutes under different Sample Interval 2019/7/9
9
Outline Data Set Math Model Delay Predicting
Delay Heuristic Information Conclusion 2019/7/9
10
Stochastic Process Model
Jump Statistical Characteristics change Routing Alternation Perturbation Mean Value Ergodic Generalized Stationary process Load Changes of Network and CPU 2019/7/9
11
Jump-Determine Rule 2019/7/9
12
Jump-Determine Rule Threshold value:
Exceed threshold value more than times in the future intervals. 2019/7/9
13
Jump-Examine (a) Jump Frequency (b) Jump Interval 2019/7/9
14
Perturbation Steady Mean Value Ergodic
Unit Root Squaring Method-ADF examines 50 pairs Nodes,1% Level of Significance Mean Value Ergodic 2019/7/9
15
Outline Data Set Math Model Delay Predicting
Delay Heuristic Information Conclusion 2019/7/9
16
Delay Predicting Problem
2019/7/9
17
Predicting Methods 2019/7/9
18
Outline Data Set Math Model Delay Predicting
Delay Heristic Information Conclusion 2019/7/9
19
Geography 2019/7/9
20
IP Prefix 2019/7/9
21
IP Prefix 2019/7/9
22
Outline Data Set Math Model Delay Predicting
Delay Heuristic Information Conclusion 2019/7/9
23
Conclusion Stochastic Process Model Delay Predicting
Jump Perturbation Delay Predicting Minimum recently two RTTs Delay, Geography and IP Prefix 2019/7/9
24
Q and A? Thank You
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.