Download presentation
Presentation is loading. Please wait.
Published bySandy Wood Modified over 10 years ago
1
CELware Logistics Pvt Ltd
2
6/13/2014 2 This premises is centrally located with state-of-art facility Its Pre Engineered Building design by Everest Industries Ltd Heat insulated building, leading to an average reduction of 6 - 7 degrees C from ambient. Fire retardant. Improving the worker efficiency and safer storage of goods. Good exhaust of internal air and free inflow of fresh air. National Highway no - NH 4 Distance from Panvel Railway Station to warehouse - 20 Min Distance from Palaspe Phata to warehouse - 15 Min Distance from JNPT to Warehouse - 30 Min Distance from proposed Navi Mumbai International Airport - 25 MIn Distance from Kalamboli CFS to warehouse - 25 MIn DISTANCE & HIGHWAY DETAILS : A strategic Location
3
6/13/2014 3 Front side view
4
6/13/2014 4 Rear side view
5
6/13/2014 5 Side view + Rear View
6
6/13/2014 6 Layout with Demarcation
7
6/13/2014 7 Elevation and Layout
8
6/13/2014 8 Area of plot size - 134550 Sq.Ft Open Space - 77500 Sq.Ft Carpet area - 57050 Sq.ft, with ample open space where trucks can be parked Total Built-up area = Carpet area + 20% = 68460 Height – Corner – 23 F & center -32 F Flooring is best in class – TRIMEX Floor design considering installation of heavy duty racks, with use of stacker, reach truck, fork lift Thickness of flooring – 200 MM with load capacity of 6 MT per Sq.Mt No of Rolling shutters – 11 provision for 2 Dock Levelers, operations would be fast due to quick turn around time High density rubber fitted on anchor bolts for protection of Platform edge Canopy to be provided on all the rolling shutters Proper drainage facility Drainage of storm water in Nala CELware Logistics warehouse features
9
6/13/2014 9 Ducts of Power, Water, Drainage, Sewage, Fire Fighting Sewage designed for nature flow using gravity to avoid stagnant water There would be shower area, Locker room facility 24 hrs Security Services There would be pantry, canteen facility Barbed fencing for the entire facility Sufficient lighting & illumination All installations in accordance with Industrial Norms for Warehouse with proper specification. Provision for Stacker / Forklift charging stations and other gadgets. Focus lights at loading bays, Canopy lighting and street lighting. Separate transformer for this facility Sanction power supply of 80 KVA from MSEDCL Separate DG set would be provided for electricity back-up Sufficient water facility with a base tank i.e. 50000 Ltr capacity CELware Logistics warehouse features
10
6/13/2014 10 Placing fire extinguishers and buckets Bottom fire buckets as per ISI grade Red color painted buckets Communication & internet access Signages and boards to be provided Premises can be provided as single user facility or multi user facility Separate entrance provided for forklift / stacker ramp Turbo ventilators are provided - Good exhaust of internal air and free inflow of fresh air Parking space allotted for four wheeler and two wheeler CELware Logistics warehouse features
11
6/13/2014 11 Domestic Suppliers Global Suppliers Consolidation Center Consolidation Center Grocery HyperMkt Grocery HyperMkt Transportation Consolidation Center /Warehousing Manufacturing/ Processing Center Transportation & Distribution Stores Consumers Across Continents Material / Information / Cash Transportation Road / Rail / Air / Sea Primary & Secondary Road Transportation Freight Forwarding Express Multi-Modal Warehousing Order fulfillment Inventory Control Consolidation Processing Storage (Cold) Bulk Break Packaging & Labeling Distribution Order Execution Routing & Scheduling Vehicle Optimization Track & Trace Reverse Load CELware Logistics Participation in Supply Chain
12
6/13/2014 12 Packing / Re-packing Kitting / De-Kitting Labeling Vendor Managed Inventory Assembling Quarantine and disposal Reverse Logistics Bar coding Shrink wrapping Distribution IT enabled solutions - WMS Capex ( owned / leased) (VAS) Value Added Services
13
6/13/2014 13 CELware Logistics looks for strategic alliance and long term relations with its esteemed clients Right time to shake hand as partners where CELware Logistics will work towards bringing more efficiency We can be single window service provider reduce the headache of multiple LSP ( Local Service Provider) We are transparent in dealing, speed to response to your requirements, flexibility in supporting in various requirements CELware Logistics outlook towards Esteemed Clients
14
6/13/2014 14 THANKS Address : Celware Logistics Pvt. Ltd. Survey No. 28/1/A, 28/1/D, 44/2 & 45, Village Gulsunde, Dand - Apta Road, Near Dimple Drums & Barrels Pvt. Ltd., Rasayani, Dist Raigad Panvel – 410 207
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.