Bob's Burgers, Hammond Louisiana
Chris LeSage and Luke Little Instructor: Dr. Koutsougeras Advisor: R. Edward Rode' Fall 2018-Et 493 Senior Design Proposal
2
Proposal – Bob's Burgers
Objectives: Develop a design for Bob's Burgers in Hammond, La. Find sites suitable to fit the customers' needs. Develop a floor plan designed with AutoCad. Use all knowledge and resources to research the buildings codes. Prepare required paperwork to start LEED process.
3
Site Option #1 Location: 404 University Ave, Hammond, La Gross Building area: 3,200 sf Sale Price: $615,00o *This in our opinion is the best overall location. This location is in walking distance, has heavy through traffic, and has ample space.
4
Site option #2 Location: 1000 N Oak St, Hammond la, Gross Building size: 2,300 sf Sale price: to be determined *this location features heavy through traffic, and walking distance from the engineering building. The only downfall is parking is very limited.
5
Site location #3 Location: n morrison blvd Gross Building size: 20,500sf Lot size: 3.73 ac Sale price: $550,000 Interesting location. Selling points for this size of lot for price. Also it is 1.8 miles (3min) away from campus, so ease of access is still factor.
6
Leed certification We will be trying to obtain leed’s bd+c certification . This will be very challenging given the way the restaurant industry wastes products and consumes a lot of energy. We will be focusing on the bigger point items to try to achieve the minimum We have our work cut out for us on this aspect on the job
8
Fall 2018 Timeline September 2018 Week of 9/10/2018
Determine 3 site location options (Chris) Begin research on applicable building codes (Luke) Week of 9/17/2018 Determine design of building (Chris/Luke) Week of 9/24/2017 Start research on all LEED requirements (Chris) Start research on all building codes (Luke)
9
Fall 2018 Timeline October 2018 Week of 10/22/2018
Survey site chosen by customer (Chris/Luke) Week of 10/8/2018 Continue research on building codes (Luke) Continue research on LEED codes (Chris) Week of 10/15/2018 Begin preliminary sketches of building. (Chris/Luke) Week of 10/22/2018 Continue preliminary sketches of building (Chris/Luke) Continue/finish research on building codes (Luke) Continue/finish research on LEED codes (Chris) Week of 10/29/2018 Continue sketches of building (Chris Luke)
10
Fall 2018 Timeline November 2018 Week of 11/5/2018
Complete sketches of building (Chris/Luke) Week of 11/12/2018 Complete elevation sketches for site (Chris/Luke) Week of 11/19/2018 Put together a professional presentation (Chris) Miscellaneous tasks (Chris/Luke)
11
ANY QUESTIONS?