Download presentation
1
MONGOL GAZAR LLC OLON OVOOT GOLD PROJECT
LAND PROPERTY EXPLORATION MINING PROCESSING PLANT
2
OLON OVOOT GOLD PROPERTY LOCATION
ULAANBAATAR Mandal ovoo OLON OVOOT GOLD DEPOSIT Dalanzadgad
3
LAND PROPERTY MONGOL GAZAR OWNED HECTAR EXPLORATION LICENCE
4
EXPLORATION GEOLOGICAL MAPPING GROUND GEOPHYSICAL SURVEY SAMPLING
TRENCHING CORE DRILLING RC DRILLING ASSAY
5
DIAMOND CORE AND REVERSE CIRCULATION DRILLING
6
KHANIIN KHETS OROGENIC GOLD FIELD
UNEGEN DEL Length km Width km ITGEL MODOT DIORITE BOROODON GAVUU OLON OVOOT BURKHAN DEL OVOOT III
7
KHANIIN KHETS GENERAL STRUCTURAL PLAN
GOYOT SYNCLINE KHORIMT ANTICLINE OVOOT SYNCLINE
8
OLON OVOOT – GREENSTONE HOSTED, OROGENIC GOLD DEPOSIT
HOST ROCK: -ANDESITE, ANDESITIC TUFF, SUBVOLCANIC BODIES OF DIORITE, ALL COMPETENT -SANDSTONE, MUDSTONE, PHYLLITIC SHALES, SERICITIC SHALES, ALL INCOMPETENT STRUCTURE: - DEFORMATION STYLE STRUCTURE: - FOLDS, HINGE AND HINGE SURFACE ZONE LEG ZONE, SADDLE REEF ZONE. - FAULTS, SHEAR ZONES, MYLONITE AND CATACLASITE ZONE ALONG SHEARING, REVERSE FAULTS
9
ALTERATION AND MINERALIZATION
SERICITIZATION SILICIFICATION CHLORITIZATION CARBONATIZATION PROPYLLITIZATION MINERALIZATION QUARTZ-LOW SULPHIDE Au-QUARTZ-ANKERITE QZ-SERICITE-PYRITE-ANK QZ-SER- ANK-As-c PYRITE CHLORITE-QZ-SER-ANK-PY
12
GOYOT ULAAN EXPLORATION TARGET AREA
13
MURGUTSUG EXPLORATION TARGET AREA
14
GEOLOGICAL MAP OF BURKHAN DEL GOLD DEPOSIT 2D MODEL
15
DRILL HOLE LOCATION OF OLON OVOOT GOLD DEPOSIT
16
GEOLOGICAL CROSS SECTION OF OLON OVOOT OROGENIC GOLD DEPOSIT LINE 433010
17
GEOLOGICAL CROSS SECTION OF OLON OVOOT OROGENIC GOLD DEPOSIT LINE 433170
18
GEOLOGICAL CROSS SECTION OF OLON OVOOT OROGENIC GOLD DEPOSIT LINE 433330
19
TSAGAAN TOLGOI ORESHOOT OF OLON OVOOT OROGENIC GOLD DEPOSIT
20
HUREN TOLGOI ORESHOOT OF OLON OVOOT OROGENIC GOLD DEPOSIT
21
BASIC GEOSTATISTIC PARAMETERS OF THE OLON OVOOT OROGENIC GOLD DEPOSIT
22
BASIC GEOSTATISTIC PARAMETERS OF THE OLON OVOOT OROGENIC GOLD DEPOSIT
23
OLON OVOOT ORE SHOOTS LOOKING FROM NORTH-EAST
24
OLON OVOOT ORE SHOOTS LOOKING TOP
25
OLON OVOOT BLOCK MODEL
26
3D MODEL ORESHOOTS OF BURKHAN DEL GOLD DEPOSIT
Looking from SE
27
PIT DESIGN TO 200 M DEPTH
28
PLAN VIEW OLON OVOOT MINING
29
MAIN PIT AREA
30
WASTE HAULING
31
INSIGHT SECTIONS OF OLON OVOOT GOLD DEPOSIT LINE 433000
ORE ZONE ORE ZONE
32
INSIGHT SECTIONS OF OLON OVOOT GOLD DEPOSIT LINE 433204
ORE ZONE
33
INSIGHT SECTIONS OF BURKHAN DEL GOLD DEPOSIT LINE 433250
ORE ZONE
34
MONGOL GAZAR OLON OVOOT AREA GOLD RESOURCES (FEBRUARY 2007, WARDROP ESTIMATE)
CATEGORY TONNES GOLD G/T GOLD OUNCES / TONNE GOLD INDICATED 7,100,000 2.9 660,000 INFERRED 1,300,000 1.5 62,500 (A) 722,500 UNCAPPED 3.5 797,000 1.8 75,000 (B) 872,000 BURKHAN DEL CATEGORY TONNES GOLD G/T GOLD OUNCES / TONNE GOLD INDICATED 2,100,000 1.6 108,000 INFERRED 355,000 1.3 15,000 (A) 123,000 UNCAPPED 2.3 155,000 (B) 170,000
35
OLON OVOOT AND BURKHAN DEL GOLD RESOURCE
CATEGORY TONNES GOLD G/T GOLD OUNCES CAPPED INDICATED 9,300,000 2.6 775,000 INFERRED 1,600,000 1.5 77,000 (A) 852,000 UNCAPPED 3.2 954,000 1.7 88,000 (B) 1,042,000 TOTAL RESOURCES ESTIMATE FOR OLON OVOOT AND BURKHAN DEL PROPERTIES OUNCES
36
PROCESSING PLANT CONSTRUCTION AT 2003
37
CIP PROCESSING PLANT PROJECT CAPACITY 2000 tn ORE PER 24 HOUR
38
IN FUTURE FIND OUT 15-20 MILLION TN ORE
BIULD NEW 5000 TN PROCESSING PLANT
39
THE END
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.