Presentation is loading. Please wait.

Presentation is loading. Please wait.

Group Project: Help with Building

Similar presentations


Presentation on theme: "Group Project: Help with Building"— Presentation transcript:

1 Group Project: Help with Building
we continue 2.15pm Group Project: Help with Building 6.S063 Engineering Interaction Technologies Prof. Stefanie Mueller | HCI Engineering Group

2 10 min per team, then switch. today: create groups of 3 teams each.
in the small groups, each team: quickly summarizes final project idea again explain what they want to build for the final demo discusses any open question e.g. which sensors to use e.g. what would be the best interactions to select for prototype 10 min per team, then switch.

3 <5 min> before we form the bigger groups,
let’s spend 5 min in your own team to define how to build the final prototype and what to demo. (it might be helpful to prepare some sketches for the group discussion) team up! <5 min>

4 pair up in groups of 6! (ca. 3 teams) let’s go!

5 10 min per team, then switch. what to do:
in the small groups, each team: quickly summarizes final project idea again explain what they want to build for the final demo discusses any open question e.g. which sensors to use e.g. what would be the best interactions to select for prototype 10 min per team, then switch.

6 end.


Download ppt "Group Project: Help with Building"

Similar presentations


Ads by Google