Presentation is loading. Please wait.

Presentation is loading. Please wait.

Introduction- Link with WG E activity CMEP PLENARY MEETING-GEEL

Similar presentations


Presentation on theme: "Introduction- Link with WG E activity CMEP PLENARY MEETING-GEEL"— Presentation transcript:

1 Introduction- Link with WG E activity CMEP PLENARY MEETING-GEEL
Mario Carere, Bernd Gawlik, Introduction- Link with WG E activity CMEP PLENARY MEETING-GEEL 17/18 NOVEMBER 2011

2 Link with WGE Inventory Guidance finalised and approved by SCG
Watch List approved by SCG Mixing zones Workshops organised by JRC Directive EQS-New Priority Substances (end of the year) Questionary on Science-Policy

3 Objective and uses of the inventory
Overall objective   improvement in RBM - practical and policy aspects MS–level use support RBM and policymaking regionalized information of input loads and the main sources / pathways of priority substances Relative contribution of natural / background inputs possible areas for reduction measures (hot spots) Information on achieved / achievable reductions better information to the public

4 General working scheme
P1: Atmospheric Deposition directly to Surface Waters P2: Erosion P3: Surface Runoff from Unsealed Areas P4 Interflow, Tile Drainage and Groundwater P5: Direct Discharges and Drifting P6: Surface Runoff from Sealed Areas P7: Storm Water Outlets, Combined Sewer Overflows and Unconnected Sewers P8: Urban Waste Water Treated P9: Individual - Treated and Untreated- Household Discharges P10 Industrial Waste Water treated P11: Direct Discharges from Mining Areas P12: Direct Discharges from Navigation P13 Natural Background 4

5 Two step procedure recommended

6 Watch list-SCG The proposal has been presented at the SCG and after discussion has been approved. Positive comments of Member states

7 CMEP MANDATE-17 november
Task 3.1 B: Case studies on statistical methods for assessing compliance. Task 3.1 C Case studies on implementation of QA/QC Directive Task 3.1 D Comparison of monitoring approaches among EU Member State Laboratories (CM on-site Exercises). Task 3.1 E Status report on the availability of laboratory intercomparisons, reference materials and other tools of quality control. Task 3.1 F Standardization of Methods

8 CMEP AGENDA-18 November Tasks 3.2 A/3.2 B Watch List:
Summary reports on research dedicated to the investigation of emerging pollutants on a European or river-basin specific level. Task 3.2 C: Technical reports on the use of alternative effect-based monitoring tools 

9 THANK YOU FOR YOUR ATTENTION


Download ppt "Introduction- Link with WG E activity CMEP PLENARY MEETING-GEEL"

Similar presentations


Ads by Google