Download presentation
Presentation is loading. Please wait.
Published byTabitha Shearman Modified over 10 years ago
1
Innovative Excellence 171 Bush Telegraph Street Northlands Business Park NorthridingJohannesburg PO Box 2291 Rivonia, 2128 Web Page: www.maXem.co.za E-Mail: info@maXem.co.za Tel: +27 (0)11 462-5114 Fax: +27 (0)11 462-8740
2
Long Hole Stoping Comparison Comparison between Small hole Tophammer - 45mm and Large Specific Drilling is required in order to maintain Powder Factor Small Hole ITH – 60mm Ability to Drill a single row of holes in center of stope is assumed Basic assumptions made for method comparison Powder Factor used is the same as that of conventional Powder Factor used is the same between compared methods Stope Span is the same between compared methods
3
Plan Section of Raise & Stope
4
Dip Section of Raise & Stope
5
Blast Pattern – Tophammer Drill Hole Diameter = 45mm Disadvantage High Specific Drilling = High Cost Small Stand-Offs to Contacts Complex Rig setup and moving Advantage Do not require defined contacts
6
Blast Pattern – Tophammer Drill Hole Diameter = 45mm Disadvantage High Specific Drilling (small holes) = High Cost Small Stand-Offs to Contacts Complex Rig setup and moving Advantage Less Drilling than 5 hole dice require medium defined contacts
7
Blast Pattern – ITH Drill Hole Diameter = 60mm Disadvantage Require defined contacts Advantage Low Specific Drilling = Low Cost Large Stand-Offs to Contacts Easy Drill Rig setup and moving
8
Long Hole Stoping Comparison Common Results
9
Long Hole Stoping Comparison Common Results – not recalculated from previous input
10
Long Hole Stoping Comparison 6m Ledging20m Full Span Stoping
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.