Nov. 10th, 2007 @T2K Meeting INGRID T. Nakaya (Kyoto)
2
1. Recent Progress Much progress on the mechanical design led by O. Ferreira (and the Ecole polytechnique group). Almost securely funded by Japan Grants-in-Aid for Scientific Research and by IN2P3 (Ecole polytechnique). We have ten proto-type scintillators from Russia in hand (one of two options). Tested with MPPC readout.
5
Scintillator modules Select the type of scintillator by the end of March 2007
6
Test of the scintillator by H. Kawamuko
< setup > cosmic ray Trigger Prototype Scinti Trigger position 100cm 20cm 10cm 5 4 3 2 1 ・The distance between trigger spots is 20cm. Read out by PMT/MPPC ・We measure ~2000events at each position.
7
7 position position ◆average efficiency ⇒ 98%
position Light position Efficiency(%) Light yields (p.e) 10 99.5 95 1 2 3 4 5 1 2 3 4 5 position position ◆average efficiency ⇒ 98% ◆average light yields ⇒ 6.7p.e. ( 14.6 p.e by both ends sum ) expected value is 14 p.e
8
Readout by MPPC efficiency light yields Position 1 > 99.9%
Raw efficiency light yields Position 1 > 99.9% 24.5 p.e. Mean ADC : 237.2 (10cm away) Position 2 > 99.9% 20.3 p.e. (30cm away) Position 3 > 99.9% May need re-measurement. Miss measure… (50cm away) assemble
9
Schedule of the module production
Installation
10
Issues. Software Man Power Simulation DAQ (not now, but in future)
mainly lack of my man power and my time.