Presentation is loading. Please wait.

Presentation is loading. Please wait.

Summary of task 2 status following Nov meeting

Similar presentations


Presentation on theme: "Summary of task 2 status following Nov meeting"— Presentation transcript:

1 Summary of task 2 status following Nov meeting
IEEE802.3aq Channel model ad hoc Task 2: Time-varying study & modal noise Summary of task 2 status following Nov meeting 30th Nov 2004 Jonathan King 30 Nov 2004 IEEE802.3aq Channel model ad hoc Task 2: Time-varying study & modal noise

2 Task 2 status following November meeting
Task 2 has given input to Channel ad hoc on all its study areas On Channel time variation mechanisms and speed of variation Fibre patchcord before main fibre link is main source of time variation Fibre vibration and quasi static IPR experiments, plus referencing GR-63-CORE has shown time variation to be characteristically slow, 10Hz or less. Polarization effect bounded and included in measurements above Dynamic test removed from draft based on slow channel dynamics informative comment may be added Temperature effects are an insignificant cause of channel dynamics Modal Noise Calculations 0.5dB noise penalty confirmed 30 Nov 2004 IEEE802.3aq Channel model ad hoc Task 2: Time-varying study & modal noise

3 Residual work items - for discussion and agreement
Complete last two items on temperature effects ? - Petre Popescu Modal noise calculations were for FP , is DFB required ? - Petar Pepeljugoski Informative note to be included on channel variation for Draft 1.X - is this required for January meeting ? Others ? Additional work items - for discussion and agreement Launch study - jointly with task 4: to be discussed and agreed goals: specific input to task force on launch conditions and launch testing in time for January meeting tasks: simulations showing coverage vs PIE-D plots as output, for various launch conditions agree common model (connector offsets, rise times, per offset statistics) recommend (simple) launch compliance test volunteers..... 30 Nov 2004 IEEE802.3aq Channel model ad hoc Task 2: Time-varying study & modal noise


Download ppt "Summary of task 2 status following Nov meeting"

Similar presentations


Ads by Google