Download presentation
Presentation is loading. Please wait.
1
ORIENT SHIP YARD
2
HISTORY OF ORIENT SHIPYARD
1987. ● Established Orient Marine Services Co., Ltd. 1995. ● Established Marine Engineering Co., Ltd. – started ship repair & conversion services 2001. ● Renamed as Orient Shipyard Co., Ltd. 2004. ● Purchased 25,000TLC(210M) floating dock & expanded ship repair business 2007. ● Both Orient Shipyard Co., Ltd. & Orient Heavy Industries Co., Ltd. cooperated together within the new shipbuilding industry. GWANG-YANG YARD 2008. ● Gwangyang Yard started new shipbuilding & conversion services BUSAN YARD 2010. ● Built-up 82,000TLC (300M) floating dock 2012. ● Gwangyang Yard started ship repair & conversion services 2013. ● Achieved ISO 9001:2008 2014. ● Achieved ISO 14001:2004 /OHSAS :2007
3
LOCATION ORIENT SHIPYARD GWANG-YANG YARD BUSAN YARD 360-226 Indeok-ro,
Gwangyangeup, Gwangyang-si, Jeollanam-do, Korea N : 34°54´42.32" E : 127° 35´ 51.39” BUSAN YARD 91,Gamcheonhang-ro 405beon-gil, Saha-Gu, Busan, Korea N : 35°06´.05" E : 128° 59´ 57.05"
4
LAY-OUT (GWANG-YANG SHIPYARD)
⑨ ⑩ ⑧ ⑦ ⑥ ⑤ ④ ③ ⑪ ② ① 300M Floating Dock Quay General work shop Clean/Cryogenic work shop Main office 6. Gas Tank Air Compressor Shop Transformer room Paint shop 10/11. Warehouse
5
Alongside P/S of F/DOCK
INFRASTRUCTURE GWANGYANG YARD – 82,000 TLC(300M) Floating Dock 1.Main Particular Length overall 300m Breadth of inside tower wall 59m Depth of pontoon 8.6m Docking draft 6.5 m Dock side depth 9m Light weight 27,885.4 tonnes Lifting Capacity 82,000 TLC 2.Main Equipments Deck crane Main.45.0t x32.5m x2sets Diesel Generator 1,000kw x 2 sets Ballast pump 2,500ton/hr x 12 sets G.S Pump 200ton/hr x 2 sets Power supply 440/220v,60Hz-400A Uilities O2,CO2.Ethylene,Air, Fresh/SeaWater Alongside P/S of F/DOCK 300M
6
INFRASTRUCTURE GWANGYANG YARD - Wharf Length 502 m Crane Water depth
- Tower Crane (12 TON) – 1기 - Hydraulic Crane(150 TON ) – 1기 - Crawler Cranme(400 TON) – 1기 - Crawler Cranme(200 TON) – 2기 Water depth 7.0m Power supply 440/220v,60Hz,700A Utility (Wharf&Dock) Air,CO2,O2, Ethylene Fresh/Sea Water
7
REPAIR FACILITIES Cryogenic WorkShop
1. Area : 187㎡(LxBxH:17m x 11m x 10m) 2. 5Ton O/HEAD CRANE – 1기 / Lifting height : Max.7.0m 3. 2Ton JIB CRANE – 2 기 / Lifting height : Max.3.5m 4. Utilities : O2,CO2, Ethylene,Air,440v/220v-1000A 17M X 11M 2. O.H CRANE : 5TON (H:7M) 3. WALL CRANE : 2TON (H:3.5M)
8
REPAIR FACILITIES Clean WorkShop 1. Area : 220㎡(LxBxH:20m x 11m x 10m)
2. 3Ton O/HEAD CRANE – 1기 / Lifting height : Max.7.0m 3. 2Ton JIB CRANE – 2 기 / Lifting height : Max.3.5m 4. Utilities : O2,CO2,C2H4,Air,440v/220v -1000A 20M X 11M 2. O.H CRANE : 3TON (H:7M) 3. WALL CRANE : 2TON (H:3.5M)
9
REPAIR FACILITIES Painting shop Division Size Capacity Air Blaster
►Shot Blasting Cell Division BAY A,B Size 40M * 50M *18M Capacity 250,000㎡/month Air Blaster 16EA Nozzle(4 x 4) * 2set Dust Collector 6000 ㎥/min * 2 set ►Painting cell Division BAY C,D,E Size 40M * 50M *18M Capacity 300,000㎡/month Air Blaster 4 x 4,000㎥/min Gas Heater 600,000 Kcal/Hr * 6set
10
REPAIR FACILITIES Machinery Processing Workshop
Company name: Dongyang Precision Working space : about 1000m2 3. Equipments CNC Cutter& Planer Miller CNC Milling& Machining NC Vertical Turning Lathe Manual Lathe Radial 1100/900 Hydraulic Press 200TON MIG & TIG Welding Machine 4. Employees for Machinery Processing Management : managing 2persons, technical support 2persons Technical Engineer 7 persons 5. Performance (Major customer:POSCO, Orient shipyard) TLC Wheel Design& Processing Locomotne door Design& Processing BTC Hook tuning device making 6. Distance from the shipyard : 2 km
11
COMMITMENT TO HSE HSE OHSAS Certificate
Health ,Safety & Environment Policy OHSAS Certificate ORIENT is OHSAS : 2007 Accredited
12
COMMITMENT TO QUALITY QUALITY Quality Policy ISO Accreditation
13
COMPETENCY Class Approvals
14
600 Vessels Repaired Since 2004
SHIP REPAIR RECORD Over 600 Vessels Repaired Since 2004 A one-stop Centre For ALL ORIENT SHIPYARD offers clients a one-stop solution For docking/repairs of LNGC/LPGC,Tanker and various kinds of floaters LNG CARRIERS LPG CARRIERS CHEMICAL TANKERS PCC HOPPER DREDGER OTHER VESSEL TYPES
15
Ship Repair Record 1. Ship’s Name : MT DL IRIS
2. Kind of ship : Oil Tanker”ESP” 3. Owner : DAELIM CORPORATION 4. GT/LxBxD : 61,619 / 244.6m X 42m X 22.2m 5. NO. of Tank : 15 Tank(Include slop tank) 6. Work period : ~ 7. Major Work Scope • HULL Blasting and paint • Renewed heating coil(sus pipe) for the all C.O.T • Renewed Cargo line • Replacement of Cargo valves • Fabricated & installed insulation of all steam & return line included valves on deck • Propeller Shaft& Rudder repair • M/E overhaul • Boiler / Economizer overhaul • Deck Machinery overhaul • Electrical systems upgrading • Others
16
Ship Repair Record 1. Ship’s Name : MV GREEN POINT
2. Kind of ship : PCC 3. Owner : LMS SHIP MANAGEMENT(USA) 4. GT/LxBxD : 51,819 / 180m x m x 34.50m 5. Work period : ~ 6. Major Work Scope • HULL Blasting and paint • Cargo Ramp Deck Controls Enclosure Repair/Renewals • Stern Ramp Fall Wires & Jigger Wire Renewals • Renewed Stern Ramp Sheave Boxes • Main Deck Vent House - Intake Louver Repairs • ER Machinery, Piping and Equipment Inspections, Repairs, Renewals • Steering Gear Hydraulic Pump Overhauls • Steel work repair • Electrical systems upgrading • Others
17
Ship Repair Record 1. Ship’s Name : MT POLAR
2. Kind of ship : LPG Carrier 3. Owner : Reederei F. Laeisz G.m.b.H. 4. GT/LxBxD : 35,853 / 205m X 32.2m X 20.8m 5. Cargo Tank : 4/ Total 60,000㎥ 6. Work period : ~ 7. Major Work Scope • HULL Blasting and paint • Cargo System Safety Valves replacement • Overhaul of Cargo valves • Change corrosion flanges on Cargo pumps • Installed Deck Penetration of Cargo Pipes • Liquid/Vapour line pressure test • Propeller Shaft& Rudder repair • Steelwork repair • M/E overhaul • Electrical systems upgrading • Newly installed Steam and condensate system • Others
18
Ship Repair Record 1. Ship’s Name : MV CORONA
2. Kind of ship : Oil / Chemical Tanker 3. Owner : MAISIE NAVIGATION CO.LTD 4. GT/LxBxD : 29,211 / 180m X 32.2m X 18.7m 5. Work period : ~ 6. Major Work Scope • Steel renewal - Port & STBD side ballast wing block - Trans & Center long Bulkhead(BHD) - Upper deck construction - Mid deck house - Shell & poop deck plate • Pipe renewal works • Out fitting • Electrical systems upgrading • Others
19
Ship Repair Record 1. Ship’s Name : MV JS PHOENIX
2. Kind of ship : Cargo Ship 3. Owner : SHINHAN CAPITAL CO., LTD. 4. GT/LxBxD : 27,986 / m X 32.26m X 16.90m 5. Work period : ~ 6. Major Work Scope • Renewed slewing bearing for No.1~4 deck crane • Gouging & rewelding for cracked crane body • Carried out machining under column of No.3 crane body • Others
20
Ship Repair Record 1. Ship’s Name : LNGC BW PAVILION VANDA
2. Kind of ship : LNG Carrier 3. Owner : BW MARITIME 4. GT/LxBxD : 105,945 / 289m X 45.6m X 26m 5. Cargo Tank : 4/ Total 162,000㎥ 6. Work period : ~ 7. Major Work Scope • NO.2 Cargo Tank SBTT • NO.2 Cargo Tank scaffolding • NO.2 Cargo Tank Membrane cutting&Re-welding • NO.2 Cargo Tank Triplex repair • Supported Utilities • Others
21
Ship Repair Record 1. Ship’s Name : LNGC CLEAN HORIZON
2. Kind of ship : LNG Carrier 3. Owner : DYNACOM 4. GT/LxBxD : 105,945 / 289m X 45.6m X 26m 5. Cargo Tank : 4/ Total 162,000㎥ 6. Work period : ~ 7. Major Work Scope • NO.1 ~ NO.4 Cargo Tank cool down • NO.1 ~ NO.4 Cargo Tank TAMI Test • NO.1 ~ NO.4 Cargo Tank scaffolding • NO.1 ~ NO.4 Cargo Membrane cutting&Re-welding • NO.1 ~ NO.4 Cargo Triplex repair • Supported Utilities • Others
22
GWANG YANG SHIPYARD 2013년 선 종 2012년 2014년 2015년 (1분기 누계) 소 계
[단위: 척] 선 종 2012년 2013년 2014년 2015년 (1분기 누계) 소 계 CHEMICAL & OIL TANKER 4 8 1 13 GAS CARRIER(LNG & LPG) 1(P) 3(N) CONTAINER & BULK 5 12 3 20 CRUISE & RO-RO 2 OTHERS 18 TOTAL 16 35 11 63
23
Thank You !