Presentation is loading. Please wait.

Presentation is loading. Please wait.

Structure of the Code Don Thomson, Task Force Chair IESBA CAG Meeting

Similar presentations


Presentation on theme: "Structure of the Code Don Thomson, Task Force Chair IESBA CAG Meeting"— Presentation transcript:

1 Structure of the Code Don Thomson, Task Force Chair IESBA CAG Meeting
New York, USA September10, 2014

2 Background Prior years – Concerns expressed March 2014 – CAG input
April – Final Recommendations – Project proposal October – Consultation Paper October – Exposure Draft

3 Consultation Paper Introduction Background Restructuring
Use of Language Re-organization 6. Responsibility 7. Electronic Code 8. Illustrative examples 9. Table of Concordance

4 Consultation Paper Introduction Background Restructuring
Purpose of the project: improve usability of the Code Background Basis for the proposals Restructuring Purpose / Requirements / Explanatory material

5 Consultation Paper Use of language Re-organization of the Code
Make Code easier to understand, where possible Re-organization of the Code Re-numbering, re-ordering, clarifying linkage of independence to objectivity; Independence to remain integral to Code. Identification of Responsibility Clarification; firm policies; no change in meaning

6 Consultation Paper Electronic Code Examples of restructured Code
Improved navigability / filtering / linkages Examples of restructured Code From Part A (100; 120) From Part B (200; 210; 280) From Part B (290 – Approach; Business Relationships; Valuations)

7 CP – Illustrative Examples
Foreword will provide an overview For all sections Purpose, requirements, explanatory material Clear language, defined terms identified s.300 introduces networks and network firms identify responsibility for firms

8 Forward timeline (tentative)
Oct'14 – IESBA – approve CP Jan'15 – IESBA – continue review of restructured Code Mar'15 – CAG – CP responses Apr'15 – IESBA – CP responses Jun-Jul'15 – IESBA – draft ED Sep'15 – CAG – draft ED Oct'15 – IESBA – approve ED Early 2017 – Finalize and issue a restructured Code Jan'18 – Code effective

9 Matters for IESBA CAG Consideration
Any Comments or Questions ?

10


Download ppt "Structure of the Code Don Thomson, Task Force Chair IESBA CAG Meeting"

Similar presentations


Ads by Google