Download presentation
Presentation is loading. Please wait.
Published byThéophile Roussel Modified over 5 years ago
1
Month Year doc.: 15-13/0083r0 September 2018 IEEE RR-TAG Waikoloa Interim Meeting Liaison from to Dates: 11 Sept 18 13 Sept 18 Authors: Jay Holcomb (Itron) John Doe, Some Company
2
Congratulations Congratulations to Rich Kennedy for being awarded:
Month Year doc.: 15-13/0083r0 September 2018 Congratulations Congratulations to Rich Kennedy for being awarded: IEEE-SA Standards Medallion “For being a driving force to achieve the worldwide harmonization of spectrum for IEEE 802TM Wireless Networks (e.g. Wi-Fi).” Jay Holcomb (Itron) John Doe, Some Company
3
ETSI BRAN: Meeting #99: 18-21 September
Month Year doc.: 15-13/0083r0 September 2018 EU items -1 The publication process for ETSI wireless standards is being interrupted by controversies over the content of and process for creating and publishing the standards. ETSI BRAN: Meeting #99: September Upper 6 GHz band TFES TR early draft is out and BRAN TR is posted. ETSI-ERM-TG-11: Meeting #54: October EN (v2.2.1 ( )) will not be published in the OJEU. To avoid existence of 2 different versions, the older v may be withdrawn. Jay Holcomb (Itron) John Doe, Some Company
4
CEPT–ECC SE45: Next f2f: 2-3 October, Maisons-Alfort, Paris (France)
Month Year doc.: 15-13/0083r0 September 2018 EU Items -2 CEPT–ECC SE45: Next f2f: 2-3 October, Maisons-Alfort, Paris (France) Minutes have been published for the previous meeting. Discussions took place in SE45 and in FM57 on UWB, FM57 Document 8 has the details. Input papers being worked on for the next meeting, revised simulation results, duty cycle, channelization, etc. CEPT–ECC FM57: Next f2f: 4 October in Maisons-Alfort, Paris (France) A telecon on just yesterday, minutes not out yet. FM57(18)007 Draft interim report in response to mandate is available for comment. Jay Holcomb (Itron) John Doe, Some Company
5
Google Waiver request, increased power at 60 GHz
Month Year doc.: 15-13/0083r0 September 2018 Google Waiver request, increased power at 60 GHz Original waiver request Our comments: Google reply: Facebook support of IEEE comments and more Google reply to our comments did not fully answer our concerns, however Facebook did do a nice response that covered these points. A joint letter from Google and FaceBook was just posted in the FCC filing. With a compromise of lower EIRP of +13dBm from original request and duty cycle limits of 10% over 33mS. This task is moving to monitor only, to see what final results are. Jay Holcomb (Itron) John Doe, Some Company
6
FCC – Flexible Use of the 3.7 to 4.2 GHz Band, Order & NPRM
Month Year doc.: 15-13/0083r0 September 2018 FCC – Flexible Use of the 3.7 to 4.2 GHz Band, Order & NPRM ECFS: Mentor: NPRM came out in Federal Register on 29 Aug: <click here> Comments are due on or before October 29, 2018; Reply comments are due on or before November 27, 2018. Sent to .11, .15, .22 and .24 chairs. To date, no contributions for doing comments, will drop off list. Jay Holcomb (Itron) John Doe, Some Company
7
6 GHz and single voice from IEEE 802 (1/2)
September 2018 6 GHz and single voice from IEEE 802 (1/2) Should see the NPRM ‘draft’ text 3 weeks before the FCC Open meeting this is on the agenda. (Open meeting dates: 26 Sept, 23 Oct, 15 Nov) The time frame for comments and reply comments should be in this. Next step continues on where the 11ax CoEx document goes. There is a draft of the CoEx document comment resolutions and status: Plan is to have CoEx document in place by the November Plenary. If the NPRM comes out before IEEE 802 has a single voice, the .18 chair will call teleconference (s?) to work on the plan for NPRM response. Here is the link to the document discussed at the July Plenary with several of the EC Chairs, that talks to some options. Jay Holcomb (Itron)
8
6 GHz and single voice from IEEE 802 (2/2)
September 2018 6 GHz and single voice from IEEE 802 (2/2) Question asked thursday: Anything we can do to prepare for NPRM? We identified several of the more pertinent filings in the proceeding that represents the different groups to understand direction the proceeding is going. (see back up slides at end.) Will have discussion on 27 September teleconference on observations from the filing and educating all on the proceeding. Then on 04 October teleconference there is possibility of the draft NPRM maybe out to start to review and understand it. At the end meeting, if IEEE 802 is not finding a single voice / plan for the NPRM on desired IEEE 802 technologies for the band, would like to add to the option list maybe IEEE 802 comments on a view for spectrum management of the band. Jay Holcomb (Itron)
9
Since July Plenary IEEE EU spectrum management statement
September 2018 Since July Plenary IEEE EU spectrum management statement Summary was the IEEE EU should consider using the IEEE SA Intelligent Spectrum Allocation and Management statement: sent to GPPC and cc:’d the IEEE EU spectrum group contact. No reply at this point. Uganda Consultation Approved and sent to UCC. Asking for feedback on guidelines to guide its management of TVWS. EC approved: Ofcom Consultation, RR-TAG approved, EC Ballot done this week. Asking for feedback on WRC-19 Agenda Items. RR-TAG approved: . ; Jay Holcomb (Itron)
10
Approved Documents Approved this week Agenda for the week
September 2018 Approved Documents Approved this week Agenda for the week (or latest) July Plenary minutes Jay Holcomb (Itron)
11
Actions required from this week
September 2018 Actions required from this week Setup agendas for 27 September and 04 October to do what we can on some preparation for the 6 GHz NPRM. A member is working on discussion points for the multiple data bases that are showing up. Monitor: Sharing and license-exempt; Additional Fixed Service (FS) Protection ex parte, another database <doc> Next Generation Spectrum Management (NGSM) <doc> WNG proposal on Future of Unlicensed Spectrum <doc> A perspective on regardless of everything we do, the available spectrum has a hard limit <doc> Including push to bi-directional sharing <doc> Other: EU Spectrum Management Statement Google waiver Jay Holcomb (Itron)
12
802.18 Meeting Close The RR-TAG adjourned AM1 Thursday this week.
September 2018 Meeting Close The RR-TAG adjourned AM1 Thursday this week. Will hold weekly, as needed, teleconferences, 15:00-15:55 ET Thursdays Scheduled through 27 December 2018 Watch for updates via listserver Next teleconference planed for 27 Sept 2018, 1500et/1200pt No teleconference next week, 20 Sept. Call in information: 18-16/ (or latest, watch for an update) All notices are sent through the list server reflector. The next face to face meeting of the RR-TAG will be at the IEEE 802 Plenary Nov 2018 at the, Marriott Marquis Bangkok, Thailand. Jay Holcomb (Itron)
13
September 2018 Thank You Jay Holcomb (Itron)
14
Month Year doc.: 15-13/0083r0 September 2018 Backup Here are some of the most important filings to help show the direction the filing is going, considering the different interest groups. Response to FWCC and Comscope. This is the refined position, with some changes. Wanting to make 6 GHz like the 3.5 GHz for sharing. The 4 big mobile operators new receivers that are activated per year, now, under current rules. Doesn’t include all the changes also going on. Primary frequency coordination, so has lots of history/experience for frequency coordination.. How to protect incumbents. Jay Holcomb (Itron) John Doe, Some Company
15
Backup September 2018 More: Some of the primary interest groups.
Month Year doc.: 15-13/0083r0 September 2018 Backup More: Read attachment. Other 2 satellite operators. OET debriefing, lots of points covered. Gets you up to April 2018. Some of the primary interest groups. Broadcast Satellite Coordinator Skipped over utilities (will be protected; looking further asking for protection) <see latest> Skipped over public safety (going to First Net) (some discussion how backbone will work) No federal government uses Some additional notes. This band with 9 sets of rules is a very unique band in that respect. To add to the possible list of option for a single voice for IEEE 802: have a view on spectrum management of the band. (and maybe more silent on the rest). Along with the desired one on technologies. Jay Holcomb (Itron) John Doe, Some Company
16
September 2018 Month Year doc.: 15-13/0083r0 Jay Holcomb (Itron)
John Doe, Some Company
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.