Presentation is loading. Please wait.

Presentation is loading. Please wait.

FD TIG Summary for EHT Date: Authors: November 2018 Name

Similar presentations


Presentation on theme: "FD TIG Summary for EHT Date: Authors: November 2018 Name"— Presentation transcript:

1 FD TIG Summary for EHT Date: 2018-11-12 Authors: November 2018 Name
Month Year doc.: IEEE yy/xxxxr0 November 2018 FD TIG Summary for EHT Date: Authors: Name Affiliations Address Phone James Gilb GA-ASI, USD, GenXComm, Gilb Consulting Slide 1 1 1 1 Page 1 John Doe, Some Company

2 Abstract Summary of FD-TIG report and future work for the EHT SG.
Month Year doc.: IEEE yy/xxxxr0 November 2018 Abstract Summary of FD-TIG report and future work for the EHT SG. The FD-TIG report is document fd Slide 2 James Gilb (GA-ASI, USD, Gilb Consulting GenXComm) 2 2 2 Page 2 John Doe, Some Company

3 Key Parts of the Report (11-18-0498-08)
November 2018 Key Parts of the Report ( ) Section 2: Use cases Section FD MACs in research papers Section 4.3: Impact to standard Section 4.4: Prototype FD SIC systems Section 5: FD Architectures Section 6.1: Throughput gains Section 6.2: Latency reduction Section 6.3: Collision reduction Slide 3 James Gilb (GA-ASI, USD, Gilb Consulting GenXComm) 3 3

4 November 2018 FD-TIG/EHT FD-TIG focused on applications in which self-interference cancellation (SIC) would be applicable MAC changes would be the focus of the project. Project can be done with minimal changes to the PHY Probably define reserved bits in the header Possibly FD-specific preamble EHT Many good presentations on FD with frequency division duplexing (FDD) SIC may help FDD methods by reducing guard bands Slide 4 James Gilb (GA-ASI, USD, Gilb Consulting GenXComm) 4 4

5 Potential Focused Scope Statement
November 2018 Potential Focused Scope Statement “Defines methods for full-duplex operation of sub 7-GHz PHYs in the same channel.” Full-duplex using FDD could be in the same or different project. Slide 5 James Gilb (GA-ASI, USD, Gilb Consulting GenXComm) 5

6 November 2018 Straw Poll #1 Full duplex in same channel should be part of a new amendment project, either as a standalone project or as a part of EHT, starting 2019 yes no don’t care Vote only for 1 option Slide 6 James Gilb (GA-ASI, USD, Gilb Consulting GenXComm) 6

7 Which option do you support:
November 2018 Straw Poll #2 Which option do you support: Option 1: Standalone project on full duplex Option 2: EHT project should include full duplex Option 3: none of above May vote for more than 1, vote by option #. Slide 7 James Gilb (GA-ASI, USD, Gilb Consulting GenXComm) 7

8 Future plan for FD-TIG? Straw poll in FD-TIG Three possibilities:
If FD becomes a part of EHT project, do you support the continuation of a separate FD-TIG to provide a focused group to discuss FD issues? Not too many yes, a lot no. Three possibilities: Support for separate SG – work done in SG Support for being a part of EHT – work done in EHT No support, FD-TIG has finished its work.


Download ppt "FD TIG Summary for EHT Date: Authors: November 2018 Name"

Similar presentations


Ads by Google