Download presentation
Presentation is loading. Please wait.
Published bySidsel Maria Kronborg Modified over 5 years ago
1
Enterprise Systems Optimization Spring, 2012
2
SCM Overview
3
APO Core Interface (CIF)
4
Common Supply Chain Processes
VMI: vendor managed inventory
5
Common Time Horizons for SCM Processes
VMI: vendor managed inventory
6
Linear Programming (LP)
7
Five common types of LP problems
8
Five common types of LP problems
9
Steps in Formulating LP Problems
Define the objective Define the decision variables Write the mathematical function for the objective (objective function) Write a one- or two-word description of each constraints Write the right-hand side (RHS) of each constraint, including the unit of measure. Write<=, =, or >= for each equation Write all the decision variables on the left-hand side of each constraints Write the coefficient for each decision variable in each constraint.
10
Graphical Solution
11
Transportation (Network) Problem
12
Enterprise Systems Optimization SAP Implementation
13
SAP Business Suite SAP ECC SAP NetWeaver SAP SCM SAP PLM SAP SRM
SAP CRM SAP ECC
14
Level of Detail and Time Horizon for SAP APO Modules
15
SCM Processes in SAP APO Modules
DP: demand planning TP/VS: transportation planning and vehicle routing SNP: supply network planning VMI: vendor managed inventory PP/DS: production planning and detailed scheduling
16
SAP APO System Structure and Integration with SAP ERP
LIS: logistics information system: transportation data CIF: core (information) interface: master data ATP: Available to promise
17
SAP SCM Functionality THEORY AND PRACTICE OF ADVANCED PLANNER AND OPTIMIZER IN SUPPLY CHAIN DOMAIN by Sam Bansal
18
SAP SCM Modules THEORY AND PRACTICE OF ADVANCED PLANNER AND OPTIMIZER IN SUPPLY CHAIN DOMAIN by Sam Bansal
19
Two planning Scenarios for SAP SCM
Alternative Scenario Base Scenario
20
Supply Planning Tasks and Output for SCM
Identify sources for finished products Plan and consider safety levels in any location Distribute production over plants Choose production resources in plants Explode bill of materials in plants Identify sources for supply of raw materials and components Outputs Purchase requisitions Stock transport purchase requisition Planned production orders
21
Work Flow for our Exercises
22
SCM Sample: USA: 2 vendors 1 plant 2 DCs 2 customers Germany:
DE-Customer DE-DC1 DE-Plant DE-Vendor US-Vendors US-DC1 US-Customers DE-DC2 US-DC2 USA: 2 vendors 1 plant 2 DCs 2 customers Germany: 1 vendors 1 plant 2 DCs 1 customers Author: 22
23
North American Supply Chain
One plant (DL) Two DC’s (CA and FL) Two Vendors (NY and MI) Two Customers (WA and MS)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.