Announcements 1) The take home exam: will be handed out on April 23rd
should be turn in on April 28th 2) Final project due date: May 12th
2
Lecture Objectives: Learn about plumbing systems
Discuss district heating and cooling systems
3
Pipe Head Loss
4
Fittings
5
Pump curves NPSHR = Net Positive Suction Head Required
6
Pumps Raise pressure and produce flow Main type Centrifugal Example of
Turbine pump Base mounted Inline Reading (textbook) Page
8
Changing Pump Speed
9
Net Positive Suction Head (cavitation)
10
Curve for Multiple Pumps
11
System Curves ∆p ∆p A+B A B A+B A B V A B V A B Parallel Serial
12
Find a system curve for this plumbing configuration
13
Primary/Secondary and Tertiary Pumping (schematics A&B below)
Reading Assignment: Taylor, S., P. Dupont, B. Jones, T. Hartman and M. Hydeman Chilled water plant design guide. San Francisco: Pacific Gas & Electric Company. engineering.com/downloads/cooltools/EDR_DesignGuidelines_C oolToolsChilledWater.pdf
14
System balancing AHU1 AHU2 HC1 HC2 100 ft 1000 ft 10 gpm 2 gpm 10 ft
pump BOILER
15
Valves Section 5-14 and 6-15 in the textbook Types Butterfly Valves
Ball Valves Globe Valves Three way valves
16
Valve Sizing and Flow Coefficient
Cv value: in liter/hour or…. in Pa Control Valve Selection For Hydronic Systems reference:
17
Control Valve Selection For Hydronic Systems
Before DC we tried to do this Valve authority