Download presentation
Presentation is loading. Please wait.
1
Workshop on International Trade in Services
Luxembourg, 2-3 June 2015
2
What remains to be done – 4 main objectives
Methodological Handbook Compliance with Table T3 Data transmission. Quality Report Tour de Table on each issue, setting out broad timetable and identifying where additional support may be needed. Group discussion on longer term priorities (after IPA2012 project)
3
Methodological Handbook
ITS Methodological handbook. BPM6 compliance Sections on each main product grouping Tour de Table Work undertaken so far What still needs to be done Timetable Further assistance required?
4
Compliance with Table T3?
Component breakdown Partner country breakdown [To be assessed as part of quality report] Tour de Table Work undertaken so far What still needs to be done Timetable Further assistance required
5
Data transmission DSD data coding
Checking data are internally consistent before transmission (including use of EBB Programs to validate data before transmission). Data transmission using Eurostat standard IT tools. Tour de Table Work undertaken so far What still needs to be done Timetable Further assistance required?
6
Quality report Data quality assessed and described in the quality reports drafted by the SH and PH. Compliance with Eurostat Table T3 Revisions analysis Compliance with BPM6 methodological requirements (methodological handbook) Confidential cells (%) Timeliness Accessibility Tour de Table Work undertaken so far What still needs to be done – short term (within IPA2012 project) and longer term Timetable Further assistance required
7
Longer term priorities – group discussion
Future ITSS / BOP priorities in the EU context. Short term (12 months) Longer term (3 years) Useful for Eurostat to understand priorities for development in beneficiaries.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.