Presentation is loading. Please wait.

Presentation is loading. Please wait.

IRRS Mission 2011 to Switzerland: Resulting Improvements to Regulatory Processes 2014-01-23 P. Flury.

Similar presentations


Presentation on theme: "IRRS Mission 2011 to Switzerland: Resulting Improvements to Regulatory Processes 2014-01-23 P. Flury."— Presentation transcript:

1 IRRS Mission 2011 to Switzerland: Resulting Improvements to Regulatory Processes
P. Flury

2 Governmental Responsibilities and Global Nuclear Safety Regime
1 Governmental Responsibilities and Global Nuclear Safety Regime 4 Rs 4 GPs Challenge with recommendations in this module: Implementation depends on additional parties Improvements to Regulatory Processes | ENSREG/IAEA Workshop on European IRRS Missions | P. Flury

3 Responsibilities and Functions of the Regulatory Body
2 Responsibilities and Functions of the Regulatory Body 1 R 1 S new organisational unit “Decommissioning” human capital management concept defined ENSI offers demanding jobs with good career opportunities and competitive salaries Improvements to Regulatory Processes | ENSREG/IAEA Workshop on European IRRS Missions | P. Flury

4 Management System of the Regulatory Body
3 Management System of the Regulatory Body 2 S 1 GP involvement of all staff in defining ENSI‘s supervision culture integration of aspects of safety culture in ENSI‘s management system definition of procedures for changes of ENSI‘s organisation (to be integrated into the management system) Improvements to Regulatory Processes | ENSREG/IAEA Workshop on European IRRS Missions | P. Flury

5 Authorisation and Review and Assessment
4 Authorisation and Review and Assessment 2 Rs 1 S 3 GPs legal requirement for continuous back-fitting of nuclear installations extensive back-fitting practice reassessment of seismic hazards (PEGASOS) level 2 PSA for low power and shutdown states human reliability analysis comprehensive review process and update of PSA probabilistic assessment of operating experience Improvements to Regulatory Processes | ENSREG/IAEA Workshop on European IRRS Missions | P. Flury

6 Inspection and Enforcement
5 Inspection and Enforcement 2 Rs 1 S 1 GP revised and extended basic inspection programme Improvements to Regulatory Processes | ENSREG/IAEA Workshop on European IRRS Missions | P. Flury

7 Regulations and Guides
6 Regulations and Guides 2 S 2 GPs draft guidelines are published in on ENSI‘s website (3 to 5 months public hearing) written feedback accepted by any stakeholder ENSI‘s decisions on feedback documented in public hearing report discussions with the Ministry and the authority responsible for conventional safety on extending ENSI‘s responsibilities Improvements to Regulatory Processes | ENSREG/IAEA Workshop on European IRRS Missions | P. Flury

8 Emergency Preparedness and Response
7 Emergency Preparedness and Response 1 R 4 S 2 GPs ENSI participation in the new national radio safety communication system (POLYCOM) guideline on emergency response exercises revised in 2013: new requirements on long exercises Improvements to Regulatory Processes | ENSREG/IAEA Workshop on European IRRS Missions | P. Flury


Download ppt "IRRS Mission 2011 to Switzerland: Resulting Improvements to Regulatory Processes 2014-01-23 P. Flury."

Similar presentations


Ads by Google