Presentation is loading. Please wait.

Presentation is loading. Please wait.

PBN ICAO HQ Activities Overview

Similar presentations


Presentation on theme: "PBN ICAO HQ Activities Overview"— Presentation transcript:

1 PBN ICAO HQ Activities Overview
EUR PBN TF PBN ICAO HQ Activities Overview

2 PBN - Where are we now? Current PBN concept
Globally harmonized navigation specification based on existing national or regional requirement Objective: facilitation of standardization with the aim to reduce cost, confusion and accelerate implementation 02 July 2012

3 PBN - Where are we now? PBN concept developments
Builds on existing requirements Adds new specifications to address operational requirements Curtails the proliferation of number of navigation specifications Updated PBN Manual (Advance copy): 1st week of July 2012 New Edition 02 July 2012

4 PBN - Where are we now? Updated PBN Manual - highlights RNP 2 RNP 0.3
High continuity (typically oceanic/remote applications) Low continuity (typically continental applications) RNP 0.3 Intended for slow moving aircraft Radius-to-fix (RF) (terminal and approach) Fixed Radius Transitions (FRT) (en-route) Advanced RNP (umbrella navigation specification) High level ops approval guidance Improved implementation process description 02 July 2012

5 Optional Performance/Functionality
Advanced RNP Optional Performance/Functionality RNP Scalability RNP 2 oceanic/remote Fixed Radius Transition (FRT) Time of Arrival Control Barometric VNAV A-RNP + options A-RNP RF legs Parallel offset RNAV holding Continental en-route: RNP 2,1 Final approach: RNP 0.3 RNP APCH RNAV 10 RNAV 5 RNAV 1 RNAV 2 RNP 1 RNP 4 02 July 2012

6 Just Published Flight Validation 02 July 2012

7 Validation Process 02 July 2012

8 ATM / Airspace Planning and Design Support
Continuous Climb Operations (CCO) Manual Advance copy by July 2012 PBN Airspace Concepts Manual ilearn information/workshop package on PBN airspace design August 2012 02 July 2012

9 Flight Operations Support
PBN Operations Approval Manual Under review by PBN Operations Approval Tiger Team Advance copy by September 2012 ilearn information/workshop package on PBN Operations Approval September 2012 02 July 2012

10 PBN General PBN Manual next edition
Advance copy July 2012 ilearn information/workshop package on PBN overview September 2012 Online PBN implementation status tool 02 July 2012

11 PBN General PBN Implementation toolkit addressing: Executives
Regulators ANSPs Aircraft operators Manufacturers September 2012 02 July 2012

12 PBN General Instrument Flight Procedures (a summary)
Criteria to support new edition of PBN Manual Improved Baro-VNAV criteria Helicopter criteria Sample charts State Letter after IFPP/11 (December 2012) 02 July 2012

13 PBN General (Planning)
ilearn information/workshop/training package on PBN for other domains ATC Pilots Flight validation Endorsement programme for service providers Planning 02 July 2012

14 PBN General (Planning)
Collision Risk Model for PBN obstacle clearance and air-to-air separation Combined effort IFPP and SASP PBN Procedure Design Safety Assessment Manual Advanced RNP support document Planning 02 July 2012

15 New PBN documentation information Status of global implementation
Objectives New PBN documentation information Status of global implementation Identify implementation issues and problems Development of a global action plan to support implementation Plan to be presented to ANC/12 Register at 02 July 2012


Download ppt "PBN ICAO HQ Activities Overview"

Similar presentations


Ads by Google