Download presentation
1
K.M.Ashraf & Sons (Pvt) Ltd.
SIALKOT, PAKISTAN
2
K.M.Ashraf & Sons (Pvt) Ltd.
Head Office Pakistan Pull Aik Amin Abad Road Sialkot, Pakistan. Tel: Fax: Marketing Office USA 109 White Oak Lane Ste 54, Old Bridge NJ USA Tell#: Fax#: E- Mail :
3
K.M.Ashraf & Sons (Pvt) Ltd.
2nd MANUFACTURING UNIT K. M. ASHRAF PROTECTIVE GOODS PVT LTD EPZ Sumbrial Sialkot, Pakistan OVERSEASE UNIT Frist Appreal Manufacturing ( Pty ) Ltd 109 HA-Nyenye Maputsoe Lesotho. Cell# Kh Muhammad Farooq
4
K.M.Ashraf & Sons (Pvt) Ltd.
Established in 1983Converted into Pvt. Ltd 1996 Import Reg. No.: W066505 Export Reg. No.: W099174 Company Registration # L-08777 Factory Area Pakistan 200,000 SQft Factory Area Lesotho 15,000 SQft Factory Area EPZ Sumbrial 15,000 SQft
5
K.M.Ashraf Protective Goods (Pvt) Ltd.
6
K.M.Ashraf Protective Goods (Pvt) Ltd.
7
K.M.Ashraf Protective Goods (Pvt) Ltd.
K.M.Ashraf Protective Goods owned by the K.M.Ashraf & Sons Pvt Ltd is Established in 2004 And is first Production unit in Export Processing Zone Sialkot. The Unit is successfully running and exporting the goods since last five years of its age.
8
K.M.Ashraf Protective Goods (Pvt) Ltd.
Board Of Directors Mr. Khawaja Anjum Chairman Mr. Khawaja Musharraf Chief Executive Mr. Khawaja Shazad Director Mr. Khawaja Farooq Director Mr. Khawaja Arfan Director Mr. Khawaja Rizwan Director Mrs. Khursheed Begum Director
9
K.M.Ashraf Protective Goods (Pvt) Ltd.
Established in 2004 NTN .: Sales Tex No .: Company Registration # C-3011 Factory Area EPZ Sumbrial 15,000 SQft
10
Cutting HYDRALIC PRESS 03
11
Cutting
12
Cutting
13
Cutting Preparation for Baking
14
Baking Plant Machine Details HIGH TEMPERATURE BAKING PLANTS 04
HYDRALIC PRESS 03 SNAP PRESS 02 COMPRESSER 01
15
Baking Process Cut pieces according to the required shapes of High density closed hole EVA/Poly Ethylene foams are placed into high performance dies and pass through the high temperature baking plants under the temperature of 800’C to 1300’C.
16
Baking Plant
17
Baking Plant
18
Backing Plant
19
Baking Plant
20
Finishing Process Dies cool down upto the temperature of 10’C to give the final shape to the finished goods ( Protective Pads) before going into washing process.
21
Finishing
22
Finishing
23
Packing Process After washing the protective Pads, the final product go through the inspection and sorted out. The good units goes to the final packing according the requirement of customers.
24
Packing
25
Stores
26
Main Customers are ; FRUIT OF THE LOOMS RUSSELL/BIKE DON ALLESON
RAWLINGS REEBOK FOOT LOCKER WILSON RIDDELL
27
STANDBY POWER GENERATION
100 KVA STANDBY POWER GENERATION UNIT
28
SOCIALLY RESPONSIBLE WORKPLACE
Complied with local laws and globally accepted standards on Child Labor, Laws and Workplace Regulations, Compensation and Benefits, Hours of Work, Health And Safety, Environment, Customs Compliance
29
HUMAN RESOURCES DEPARTMENT
Training First Aid Fire Training Worker Health & Safety Technical training Job & Performance Evaluations
30
CUSTOMER EVALUATIONS RUSSELL RAWLINGS REEBOK ADAMS USA WILSON RIDDELL
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.