Download presentation
Presentation is loading. Please wait.
Published byGeorgina Ray Modified over 5 years ago
1
Machine Directorate All-hands meeting November 14, 2017
13: :10 Welcome 13: :40 Remarks from the DG 13: :05 Pre-Ops and Garfunkel 14: :25 Move to Site 14: :50 Site status and enablement of the machine design 14: :15 All what you always wanted to know about PSS… 15: :45 Coffee break
2
Machine Directorate All-hands meeting November 14, 2017
15: :10 Neutron Beam Extraction System 16: :35 TSS Overview and Reliability 16: :55 Ortho and para hydrogen catalyst selection 16: :15 Accelerator Installation, Test and Commissioning Plan 17: :35 Cryogenics - Installation progress and lessons learnt 17: :00 Ion Source and LEBT 18: :00 Mingle/cocktail
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.