TRAFFIC DESIGN UPDATE SPECIFICATIONS
QUARTERLY DESIGN MEETING JANUARY 29, 2008
2
CONCLUSIONS Things are always changing
Check with us at major project milestones Proper to go through Mary Ann or Fred
3
ADOT vs. MOA TS2 Level 2 TS1 Manufactures Assisted Startup
In-House Startup Frangible Bases Slip Bases Loop Install/Location Detail on ftp site Standard Drawing T-32.01 In House Signal Timing Signal Timing & Adjustments HPS Lighting MH, Induction Lighting Signal Control Cable to Ped equip. 4C#14 to signal heads and buttons 5C#14 to signal Heads and 3C#14 to buttons
4
THINGS TO LOOK FOR IN THE FUTURE
01 AASHTO with fatigue category importance factors from Fatigue Category II Manufacturer assisted startup, , will still be used but we intend to phase it out by next year. This Item has been included under Signal System Complete.
5
NUTS & BOLTS Charpy requirements in 740-2.02
Welding re-written by bridge see 661 photocell Controller specifications reside in 740 for the NEMA TS2 Level 2 controller Anchor rods for signal poles included in T52.15 the new foundation details and the MCL
6
RESOURCES ftp address: ftp://ftp.cadastral.info/dot-cadastral/Design_Engineering/Region%20Details/Traffic Contact for Pole Analysis Program: Steve Garlic Hg Engineers (LLC) Place SE Salem Oregon
7
QUESTIONS?