WP22 WASA 2 Site Description Report Trip WM11
Replaced 60, anemometer, cable and junction box at WM11. Possible hail/ice damage to lower T-grad radiation shield Arranged with farmer to fit our own lock to gate Wind Atlas for South Africa (WASA)
2
WP22 WASA 2 Site Description Report Trip WM12
Checked connections of Tgrad sensors, as the max and min values showed regular spiking, possibly due to a loose wire connection. Very secure palisade fencing now erected around mast base. Clamped 20m WD sensor along boom to check boom directions WM14 Clamped 20m WD sensor along boom. Wind Atlas for South Africa (WASA)
3
Contingency Trip WM01 Replaced logger battery at WM01
Solar panel full of bird droppings (below left) and solution implemented (below right) Wind Atlas for South Africa (WASA)
4
Contingency Trip WM01 & WM01
Solar panel full of bird droppings at WM02 (below left) and solution implemented (below right) Wind Atlas for South Africa (WASA)
5
Next 6 months Continue with data collection and QA
Finish Site Description Report Report on WASA1 maintenance by Webb Keep tabs on WM14 battery volts Replacement of Tgrad radiation shield at WM11 Wind Atlas for South Africa (WASA)