Presentation is loading. Please wait.

Presentation is loading. Please wait.

Participatory Planning

Similar presentations


Presentation on theme: "Participatory Planning"— Presentation transcript:

1 Participatory Planning
Case Study: Jordan Amman-Zarqa Basin

2 Amman-Zarqa Basin, Jordan

3 Intense groundwater development
1970’s – government launches full-scale agricultural development program 1980’s – market-driven private development Urban development

4 Intense groundwater development
Total abstraction: 145 MCM (1999) Out of which irrigation: 80 MCM Safe Yield: 70 MCM This resulted in: Water shortage and salinity increase Drying up of springs Water quality deterioration Groundwater table decline

5 Groundwater table decline

6 Estimate of losses (20 yrs)
USD 8.3 M because of higher pumping cost USD 7.1 M because of well deepening USD 25.6 because of abandoning of wells USD 33.0 because of crop losses due to salinity increases

7 Participatory development groundwater management
of options in groundwater management in Amman-Zarqa Basin

8 Stakeholders discussions

9 Process Rapid appraisal by team of professionals
Field interviews 50% of well-owners Confidence building: Presentation of water overview Offer to measure water quality

10 Process Individual farmers asked to suggest practical actions
Small groups meetings involving community leaders Workshop with various well-owners and community leaders

11 Outcome (1) Want to reduce irrigation water consumption but without loss of income Want to be better informed on water conservation methods and after-sales services of drip systems Willingness to ‘sell out’ wells against fair compensation Metering is not considered a reliable tool; charging is not accepted

12 Outcome (2) Support ban on unlicensed drilling
Additional water resources Willing to reduce recycled water (50%) Explore local water harvesting or sharing aquifers with Syria Accept idea of Groundwater Managment Consultative Committee (77%)

13 Follow up Different options: Assessment of legal implications
Estimate of impact on abstraction Discussion, workshop and scenario development on: Water management extension services Buy-out of irrigation wells Limiting annual abstraction and/or crop area Exchange of groundwater with recycled waste water Municipal and urban pumping reduction Option 1,3,4, 5 implemented or piloted

14 Acknowledgement This case study is based on:
Mohamed Chebaane, Hazim El-Nasir, Jim Fitch, Amal Hijazi and Amer Jabbarin: ‘Participatory groundwater management in Jordan: development and analysis of option’ (Hydrogeology Journal, 12: 14-32) Pictures were kindly made available by Mohamed Chebaane


Download ppt "Participatory Planning"

Similar presentations


Ads by Google