CETAL PW September 2016
2
CETAL-PW , JUNE STATUS Front-end recovered after component (wave-plate, booster cristal rod, etc) and consumable parts replacement (flash lamp) 3 ATLAS rods broken → scheduled for replacement 3 ATLAS rods became opaque → shipped for repolishing 2 damaged beam-transport mirrors → to be repaired 1 semi-damaged beam-line mirror → to be repaired or replaced
3
CETAL-PW , JULY STATUS Thales installed two new ATLAS rods, thus fully recovering one of the pumping lasers SAGA power supply malfunction due to electronic power card failure → repaired in CETAL workshop 2 beam-line system mirrors shipped to ARDOP for reconditioning One gold mirror and one substrate for new dielectric mirror ordered from ARDOP Three ATLAS rods sent to ALTECHNA for repolishing. Expected delivery time: early October
4
CETAL-PW, SEPTEMBER STATUS
Design and implementation of a versatile monitoring system for CETAL-PW beam line alignment Design and installation of a mechanical system to ease access to the M3 and M4 mirrors Thales is installing one new ATLAS rod at one of the pumping lasers Design of a complementary system for optical setup alignment, based on a fiber coupled laser diode module. Identification of an exfoliated compressor mirror → mitigation procedure implemented
5
Design of CETAL – PW laser system
6
M3, M4 mirrors new easy access system under implementation
7
CETAL – Beam line system
Compressor M1 NF CCD USB M3 M2 NF CCD USB M4 Interaction chamber NF CCD FF NF CCD USB CCD
8
M1 – new control system implemented
9
M3 – new control system under implementation
10
Damaged compressor mirror
11
CETAL-PW, next steps Install repolished rods at ATLAS lasers
Send exfoliated mirror to Thales for reconditioning. Thales will assure a replacement mirror, for temporary use. Restart experiments with slow increasing energy. Start with 5 J (~100TW) of power, scheduled to reach 25 J (~1PW) in May - July 2017. In 2017, two beam-line dielectric mirrors scheduled for repair and two new substrates to be ordered from ARDOP. Upon delivery, all beam line mirrors will have spare parts In 2017, 3 new rods for the ATLAS pumping lasers will be ordered