Presentation is loading. Please wait.

Presentation is loading. Please wait.

TGax September 2017 Closing Report

Similar presentations


Presentation on theme: "TGax September 2017 Closing Report"— Presentation transcript:

1 TGax September 2017 Closing Report
November 2011 doc.: IEEE /0xxxr0 September 2017 TGax September 2017 Closing Report Date: Authors: Osama Aboul-Magd (Huawei Technologies) Osama Aboul-Magd (Samsung)

2 November 2011 doc.: IEEE /0xxxr0 September 2017 Abstract This document is the closing report for the TGax for the September 2017 session. Osama Aboul-Magd (Huawei Technologies) Osama Aboul-Magd (Samsung)

3 November 2011 doc.: IEEE /0xxxr0 September 2017 Work Completed The TG completed the comment resolution on comments received during WG LB225 on draft D1.0. The TG approved a motion to prepare draft D2.0 and start a WG LB. Motion passed to affirm the applicability of the IEEE P802.11ax CSD to the modified PAR. The agenda is available at: Osama Aboul-Magd (Huawei Technologies) Osama Aboul-Magd (Samsung)

4 November 2017 Goals Start and complete comment assignment.
doc.: IEEE /0xxxr0 September 2017 November 2017 Goals Start and complete comment assignment. Start comment resolution on draft D2.0 Osama Aboul-Magd (Huawei Technologies) Osama Aboul-Magd (Samsung)

5 Conference Call Times Approved in July New Set of Telecons
November 2011 doc.: IEEE /0xxxr0 September 2017 Conference Call Times Approved in July September :00 – 12:00 ET September :00 – 22:00 ET New Set of Telecons Thursday November :00 – 12:00 ET Osama Aboul-Magd (Huawei Technologies) Osama Aboul-Magd (Samsung)


Download ppt "TGax September 2017 Closing Report"

Similar presentations


Ads by Google