1 PSB – Linac 4 Interfacing
PS TFB PSB – Linac 4 Interfacing Summary of discussions held with M.E. Angoletta, P. Baudrenghien, C. Carli, M. Chanel, A. Findlay, F. Pedersen Interfacing scheme under discussion Not yet finalized ! Alfred Blas IRF meeting 24/06/2009

2 Equipment to be synchronized
PS TFB Equipment to be synchronized  2μs Pre-chopper +LEBT Debuncher RF Feedforward Distri 4*rf From F. Gerigk 180 m Source 45 keV Chopper Amplitude modulated for energy modulation (painting) from P. Baudrenghien RF feed-forward, energy modulator, debuncher, distributor and rf have to be in phase with the Chopper Alfred Blas IRF meeting 24/06/2009

3 Goal: Fill - as required - the PSB phase space area
PS TFB Goal: Fill - as required - the PSB phase space area Our Quantum: the L4 bunch 1.15 * 109 protons (65mA) TRF = 2.84 ns DE = 120 keV (1s) + 1 MeV Aperture of the L4 transfer line (max bucket height = +/-1.25 MeV) - 1 MeV Hardware limitations: Energy modulation slew-rate (last 2 PIM cells): 0.2 MeV/ms Minimum Chopper TBeam-OFF = 30 ns? Chopper repetition rate < 1 MHz? Alfred Blas IRF meeting 24/06/2009

4 Actual bucket filling sketch
PS TFB Actual bucket filling sketch Longitudinal painting L4 beam energy Alfred Blas IRF meeting 24/06/2009

5 PS TFB Typical sequence The pre-chopper at 45 keV is in the beam OFF position, Distributor is in the Head dump position. Source, L4 rf and PSB rf are driven to their nominal value Pre-chopper set to Beam-ON (20μs = rise time 1-2μs + LEBT space charge compensation) and Chopper set to beam-OFF After 20 μs, Chopper set to beam-ON for the launching of the first beam synchronously with the distributor targeting the first ring to be injected Chopper activated to fill the rf buckets only Chopper in Beam-OFF position during the distributor transition (500 ns?) Distributor targeting the tail dump, Pre-chopper in beam-OFF state (20 μs rise time) Chopper in beam OFF state for 20 μs, Distributor back to the Head Dump position N.B.: With the fast beam chopping at low energy, the Tail Dump is not necessary! Alfred Blas IRF meeting 24/06/2009

6 Extreme beam types LHC pilot beam: 0.05 * 1011 p = 43 L4 bunches
PS TFB Extreme beam types LHC pilot beam: 0.05 * 1011 p = 43 L4 bunches = 0.12 PSB revolution ISOLDE beam: 2 * 1013 p = 17.4 k L4 bunches = 49.2 us of 65mA Linac beam = 74 PSB revolutions with an average bucket filling duty cycle of 2/3 Alfred Blas IRF meeting 24/06/2009

7 PSB injection practical values
PS TFB PSB injection practical values Injection duration (per Ring) k.TREV with k  [1 , 100]   Injection Bdot 1.2 Gauss/100μs ΔR =0 inj. frequency law ΔE = 154 keV/100 μs Δf = 31.6 Hz/0.1Gauss 379 Hz/100μs 19 Hz/5μs (5μs is the foreseen DSP “fast-loop-clock” period). Δp = 0 inj. frequency law ΔR = -0.8 mm/100 μs Δf = 0 inj. frequency law (fixed frequency) ΔE = keV/100 μs ΔR = mm/100 μs Alfred Blas IRF meeting 24/06/2009

8 Preliminary considerations
PS TFB Preliminary considerations For an accurate injection process, B, fRF and φRF need to be well known. Due the response time of the different interveners, and due to the flight time between Chopper and Ring ( 2μs), they also need to be known in advance (no possible feedback within the limited injection duration) All rings will wait for the beam at the same initial frequency. The BdL correctors will be set such as to create a ring to ring field difference depending on dB/dt and number of turns injected per ring such that the field at the time of the first turn injected is equal in all rings (Bdot compensation). After the start of the injection, from this initial rf frequency and during the entire injection process, each ring has the possibility to follow an independent frequency law. This frequency law will be pre-determined! The phase of the rf in all rings and during the entire injection process will be pre-determined with an acceptable accuracy (1 revolution degree). This requires a revolution reference , an injection synchronization and a predictable frequency program. Alfred Blas IRF meeting 24/06/2009

9 Evolution of the rf bucket phase during injection
PS TFB Evolution of the rf bucket phase during injection The foreseen PSB Beam Control is activated at the pace of a 200 kHz clock (every 5μs). This interrupt clock or “fast-loop-clock” is asynchronous w.r.t. the injection process. The rf doesn’t change in between 2 “fast-loop-clock” tics - period corresponding to 5 injected turns. For a perfect tracking of the rf frequency change, the “fast-loop-clock” should be in phase with the injection process. The frequency increase (ΔR =0) during injection creates a parabolic revolution phase deviation from the initial reference of 6.82o after 100 turns (1.7o after 50 turns) and cannot be ignored. The phase error caused by the step-by-step frequency program compared with the linear increase is < 54 mo and can be thus ignored. The phase error due to the 5μs jitter in the DSP generated frequency program < 1.33o after 100 turns (acceptable) Averaged Frequency Frequency Updated every 5 μs 379 Hz 100 μs Alfred Blas IRF meeting 24/06/2009

10 Injection at a fixed frequency (100 turns injected)
PS TFB Injection at a fixed frequency (100 turns injected) Ramping-up actually slower than shown Alfred Blas IRF meeting 24/06/2009

11 Injection in an accelerating bucket (100 turns injected)
PS TFB Injection in an accelerating bucket (100 turns injected) Ramping-up actually slower than shown Alfred Blas IRF meeting 24/06/2009

12 Summary concerning the PSB rf at injection
PS TFB Summary concerning the PSB rf at injection Rf synchronized to a single reference (h1 or h2) The reference will be provided by an independent CO source. Position of rf buckets predictable (enough) along the entire injection process Rf of each individual ring set to a convenient initial phase - takes into account the possible acceleration in the previously injected ring and the distributor rise time. Each ring will receive a start Injection pulse (+ end injection ?) Alfred Blas IRF meeting 24/06/2009

13 Chopper requirements (1/3)
PS TFB Chopper requirements (1/3) The role of the chopper is to inhibit the beam in these different cases: During the pre-chopper switching duration (20μs = rise time 1-2μs + LEBT space charge compensation) When the distributor is in the head or tail dump position During the switching duration of the distributor (<500 ns?) During the PSB injection process when the beam is out of the bucket During the PSB injection process within a bucket, when the beam density is required to be low (low duty cycle filling) or for bunch shaping (hollow distribution). Alfred Blas IRF meeting 24/06/2009

14 Chopper requirements (2/3)
PS TFB Chopper requirements (2/3) The chopper firing time is a function of: rf bucket position in each individual ring Distributor timing (number of turns) and its rise time L4 energy modulation (flight time change = +/- 3.4 ns over the 180 m separating PIMS and PSB injection Foil ) Distributor position (negligible flight time change < 0.6 ns) Expected rf bucket filling pattern Chopper hardware limitations TBeam-OFF > 30 ns? Repetition rate < 1 MHz? Alfred Blas IRF meeting 24/06/2009

15 Chopper requirements (3/3)
PS TFB Chopper requirements (3/3) To be asked for (?): Maximum beam-OFF > 20 μs (pre-chopper rise time) Minimum beam-ON < 4 Linac bunches = 11 ns ? (spec to be defined) Minimum beam-OFF < 4 Linac Bunches = 11 ns ? (spec to be defined) Synchronous with the L4 bunches (reproducible result: 4 bunches required doesn’t mean 4 +/- 1) Rise time < 2ns (L4 inter-bunch spacing) Alfred Blas IRF meeting 24/06/2009

16 Detailed Chopper timing
PS TFB Detailed Chopper timing Under discussion N.B: A Start Injection pulse is required for each injection in each Beam Control; a stop injection pulse may also be required? Alfred Blas IRF meeting 24/06/2009

17 Selection of the fast clock 1/4
PS TFB Selection of the fast clock 1/4 Under discussion The fast rf train is aimed at creating events within a revolution period The events are the following: L4 energy modulation Debuncher phase (debuncher position: 20 m? after end of L4) L4 beam chopping The fast rf train is either synchronous with the L4 rf or not. If it is a (sub) multiple of the L4 rf, the chopping will be reproducible without a +/- 1 Linac bunch error for EACH micro-pulse (ex: the pilot beam is composed of 43 L4 bunches that could take the form of train of 10 micro pulses of 4 bunches, which would mean +/-10 bunches or 25% uncertainty). There might also be some radio activation issues with half kicked beam within the L4 structure. Alfred Blas IRF meeting 24/06/2009

18 Selection of the fast clock 2/4
PS TFB Selection of the fast clock 2/4 Under discussion In case the L4 rf is selected as the reference fast clock, the entire PSB injection (worst case 400 μs) would mean 140 k bunches or clock tics (18b counter) Timing Value Event Number Alfred Blas IRF meeting 24/06/2009

19 Selection of the fast clock 3/4
PS TFB Selection of the fast clock 3/4 Under discussion During the injection, the timing is critical. The beam is too energetic to be lost. The different timing tables should be well synchronized at the Control level, so that when a parameter change is programmed, the sequence of table reloading is well defined (to be checked with CO crew) Nevertheless, a security at the chopper control level could be installed to avoid losses due to a mis-programming. If receiving the distributor timing it could veto the beam during a transition or when the position is “dump”. Another way of avoiding losses even within a ring is to define the timing events within a revolution period (or a pre-determined number of revolutions) so as to avoid the possibility of error integration over the 400 μs of injection. Alfred Blas IRF meeting 24/06/2009

20 Selection of the fast clock 4/4
PS TFB Selection of the fast clock 4/4 Under discussion Some possible choices: PLL generating 512 or 1024 harmonic of  PSB RF reference followed by L4 RF synchro:   + no PSB RF period boundary problem as high frequency clock and PSB RF reference are synchronized.   + no need to reprogram chopper tables when PSB RF injection reference frequency is changed   - there is a  L4 RF period jitter after resynchronisation to L4 RF, which cause a relatively large intensity jitter on short bunch trains Count L4 RF from a single PSB/L4 RF master timing reference:     + no PSB RF period boundary problem     + no intensity jitter for short bunch trains     - need to re-compute chopper tables whenever a small change is done in L4 fRF (rare) or PSB fINJ REF (more frequent) and to make sure that these changed CCV's are changed simultaneously in two different FEC's. For each PSB turn, count L4 RF from beginning of each period of PSB RF master timing reference:      + no need to re-compute chopper tables for small changes in CCV's of L4 fRF or PSB FINJ REF      -  PSB RF period boundary problem: there is an uncertainty of 1 L4 RF period concerning the number of counts within one period Alfred Blas IRF meeting 24/06/2009

21 Requirements for the application program 1/2
PS TFB Requirements for the application program 1/2 Under discussion From a unique start injection event, a revolution reference and a fast clock reference, the application defines: The sequence of beam ON-OFF along the entire injection (absolute fast clock tics or fast tics within a revolution) The energy modulation function (w.r.t. the fast clock and possibly the revolution ref) The debuncher phase function (w.r.t. the fast clock and possibly the revolution ref) The distributor timing (relatively to the revolution reference) The beam control timing (relatively to the revolution reference) The rf frequency law during injection (Δf per 5 μs) The BdL correction value Alfred Blas IRF meeting 24/06/2009

22 Requirements for the application program 2/2
PS TFB Requirements for the application program 2/2 Under discussion The input parameters will be: number of turns injected Pre-chopper timing rf voltage and phase program for h1 and h2 frequency law during injection Type of bucket filling Bdot at injection Value of the injection reference frequency Alfred Blas IRF meeting 24/06/2009

23 L4 - PSB rf interfacing Timing CO Inj. Ref 1/2 Source SP2T Application
PS TFB L4 - PSB rf interfacing Under discussion Debuncher Pre-chopper +LEBT Energy modulation Source Distri 4*rf Chopper Linac 4 180 m Beam OFF Window 45 keV Linac rf feed-forward Injection Sequencing control Voltage modulation Phase modulation L4 rf BIXi.SDIS Timing CO BIXi.SInjChop BIXi.SInjRF + ERF? Rev Inj. Ref Source h2 1/2 h1 SP2T Inj. rf reference (h1 or h2) ΔE Linac, Δφ debuncher Application BIXi.SDIS TON-OFF Chopper BIXi.RF_PHASE RF feed-forward Alfred Blas IRF meeting 24/06/2009

24 PS TFB Summary The 4 PSB rf will be synchronized at injection to a ppm programmable CO type signal generator (Pentek). This signal will be the reference both for all the L4-PSB interveners. A fast reference clock (to be defined) will provide a reference to the chopper, modulator? and debuncher? The BdL correctors will be used to equalize the dipolar field in all rings during each individual capture process The Linac4 energy will be modulated to adapt to the acceleration during the capture process in each ring The debuncher phase will be modulated to adapt to the Linac4 energy modulation The chopper will be activated taking into account the flight time changes due to the Linac4 energy modulation, taking into account the ramping-up frequency during capture, taking into account the painting scheme and taking into account the switching particularities of the chopper amplifier (if need be?). The chopper will veto the beam during the distributor transition and when the destination is “head dump. An application will calculate all the timing values concerning the chopper, the distributor, the modulator and debuncher. A pick-up sum signal or a fast transformer signal issued from the 4 PSB individual injection lines need to be available for monitoring in the BOR as a diagnostic tool for all the upstream Linac4 system. The Tail dump is not useful anymore (to be communicated to the kicker people if accepted!?) Alfred Blas IRF meeting 24/06/2009