Download presentation
Presentation is loading. Please wait.
Published byRita Tipton Modified over 10 years ago
1
System Support Dept. System Support Dept. Williams Wu Williams Wu 29/01/2010 29/01/2010
2
ENGAGED PROJECT THIS MONTH System Support System Development - Develop the BCS > Budget System > POS System > Premium Collection > FYC method - Data Center of Norch - Data Center of DaNang - Data Center of DongNai - Data Center of TWC
3
Data Center of Norch Sign the IBM AIX MA Contract for year 2010. A Sign the PCMA with Tien My Company for year 2010. B Clean the pipes of chiller machine for DC air conditioner. C
4
Clean the pipes of chiller machine for DC air conditioner
5
Clean the pipes of chiller machine for DC air conditioner (Cont.)
6
Data Center of DaNang Support to move all IT devices (Network device. PBX system) to new building. A Support to change the leased line to new building. B
7
Data Center of DongNai Finish the approval report and send back the quotations to suppliers. A Sign the contracts of all devices for DongNai. B Deploy the MPLS fiber cable for Norch building. C
8
Data Center of TWC Fix the fiber cable of backup link from 8F to 6F and 7F. A
9
Develop the BCS system AS attaining Quota(%) B Finish the six statistics reports for POS: Suspend Data Enquiry Surrender Data Enquiry Monthly Surrender Enquiry No-Taken Data Enquiry Monthly Not-Taken Enquiry Not-Taken Analysis Report Enquiry Complete the second phase of Budget System. A
10
Develop the BCS system (Cont.) C Process to modify FYC method: 1.Finish FYC target of daily report into system. 2.Finish FYC rate of new products into system. 3.Finish SPEC documents and test for agent performance salary. 4.Finish the agent performance of 200913 in testing system and pass these data to AA and Planning dep. to confirm. 5.The remainder performance scores for agent salary are already paid in one time at 200913.
11
Develop the BCS system (Cont.) Install function for Premium Collection: 1.The reasons for non-receipt of premium. 2.Habits that policy owners pay the premium. D Support to test Bancassurance product in BCS system. E
12
Complete the second phase of Budget System
13
Complete the second phase of Budget System (Cont.)
14
Finish the six statistics reports for POS AS attaining Quota(%)
15
The reasons for non-receipt of premium AS attaining Quota(%)
16
Habits that policy owners pay the premium
17
PLANNING PROJECT FOR NEXT MONTH Continue to trace the DongNai CS schedule. A Finish to modify FYC method and Install the FYC daily report to BCS system. B Maintain BCS and B2E system. C
18
AS attaining Quota(%)
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.