McLendon Enterprises Inc. and its employees share the same goals of integrity, quality, teamwork, safety and continuous improvement in each and every project.
4
Contract Revenue Earned 2011: $ 33,457,474.00 2012: $ 46,660,631.00 *Number Of Permanent Employees* 2010: 93 2011: 112 2012: 130 2013: 140 McLendon Enterprises was incorporated in 1979 at which time the leadership role was then taken over by current President / Owner, Benny McLendon
5
Transportation Projects Georgia Department of Transportation CDBG Projects City Streets / Roadway Utility Installations WaterStorm Sewer / Force main / Pump stations Other Projects Subdivisions Treatment Plants Design Builds
8
3D-GPS, 3D-MILLIMETER GPS, LPS 3D-GPS, 3D-MILLIMETER GPS, LPS BUILDING TODAY'S INFRASTRUCTURE WITH TOMORROWS TECHNOLOGY
9
- - INCREASE GRADING PRODUCTIVITY SIGNIFICANTLY - - REDUCE STAKING ON JOBSITE ALMOST ENTIRELY - - CONTROLLING OF MATERIAL
10
- - UP TO 300% MORE ACCURATE THAN STANDARD GPS - - INCREASED PRODUCTIVITY – FEWER PASSES NEEDED TO REACH FINISH GRADE - - GRADE TO TIGHTER TOLERANCES
11
-- HIGH ACCURACY FOR TIGHT TOLERANCES PROJECTS - - USED WHEN THE JOBSITE DOES NOT HAVE VISIBILITY TO OPEN SKY I.E. WORKING BETWEEN BUILDINGS OR IN HEAVY TREE COVERAGE
12
CURRENT PROJECTS AS OF AUGUST 1, 2013 MCLENDON ENTERPRISES INC. FOOTPRINT IN GA.
13
- - LENGTH OF TAXI WAY = 6,800 FEET - - LENGTH OF TUNNEL =1,200 FEET - - PILES DRIVEN = 688 - - CUBIC YARDS OF DIRT MOVED = 850, 000 - - COST OF PROJECT = $ 24,371,531.00 NORTH AVIATION EXPANSION
14
- 15,000 CYDS. OF DIRT REMOVED - - THREE RUNS OF 72 RCP 180 LONG EACH REPLACED - - 50 CYD. CONCRETE WEEP WALL INSTALLED - - 20,000 CYDS. OF DIRT REPLACED - - 130,000 LBS. OF SAND AND CONCRETE BAGS - - REPLACED 300 OF RAILROAD PLANT VOGTLE 21 DAY EMERGENCY RAIL REPAIR
15
- - LENGTH OF PROJECT = 2.5 MILES - - TOTAL UNDERGROUND UTILITIES INSTALLED = 9,750 FEET - - CUBIC YARDS OF DIRT MOVED = 60, 000 - - COST OF PROJECT = $ 7,895,231.00 DEAN FOREST ROAD WIDENING
16
- - LENGTH OF PROJECT = 1.58 MILES - - CYDS. OF CONCRETE POURED FOR RETAINING WALL - = THREE FOOTBALL FIELDS x THREE FT. DEEP - - TOTAL UNDERGROUND UTILITIES INSTALLED = 84,480 FEET - - COST OF PROJECT = $ 18,934,256.00 GA DOT MLP OO-0030-(081) EVANS COUNTY
17
NEW MEADOWS HOPISTAL COST OF PROJECT = $ 4,183,202.00
18
MCLENDON ENTERPRISES INC. WORKING HAND IN HAND
19
- - CREATING MAXIMUM VALUE FOR EVERYONE - - WAYS TO MAINTAIN PROJECT SCHEDULES - - HIGH QUALITY PROJECT RESULTS BUDGETING
20
- - PLANNING AND PREPARING - - PROJECTS PROGRESSION - - EXECUTION OF PLANNING - - PROJECT COST ANALYSING ON SITE MEETINGS
21
- - - DID WE MAINTAIN A GOOD QUALITY PRODUCT ? - - DID WE FINISH UNDER BUDGET ? - - DID WE FINISH PROJECT EARLY ? - - WHAT DID WE LEARN - - WHAT DID WE LEARN ? COMPLETION OF PROJECTS
23
ITEMS TO DISCUSS : - MCLENDON ENTERPRISES HISTORY: PAST, PRESENT, AND FUTURE