1
Trying to get the shingling finished in a snowstorm
2
Charron going up the valley
3
Looks like Santa Claus
4
Moving up the roof
5
In floor heating pipes and sewage pump
6
I use these photos for measurements needed when the floor is finished and Im installing partitions
7
The sunlight will help us clear snow from the plywood
8
New garage door openings behind the sliding doors
9
A promising sunrise
10
Larry has come to pour the basement floor
11
The concrete truck promptly gets stuck – two tractors to help get it in position to pour through window openings
12
Concrete chute through a window opening
13
Finished – pulled up onto the driveway
14
Wash out the chute into the bucket for disposal
15
Freshly poured concrete in the basement
16
The other end of the basement
17
Hammer and tong on the roof to get it finished
18
Lots of straw helps with traction – little frost in the ground
19
North side is finished
20
East side of the link is finished – two roof vents
21
Putting on the ridge cap
22
Oscar inspects
23
Typar on the east wall – joints taped
24
Power trowel to give us a smooth finish
25
The arrival of Prest Electric – local electrician
26
Basement windows installed in the bedroom
27
Installing windows in the basement living area
28
Floor finisher leaves us some concrete from hand troweling
29
Windows installed – east end of the basement
30
Nosy Parker watches what we do
31
Now the concrete has to dry thoroughly
32
It will take some time before we can install partitions
33
Propane heater helps the process
34
In floor heating tubes can be hooked up to the water heater
35
A row of basement windows
36
East end of the basement – windows at grade
37
My morning arrival
38
Typar on the interior of the basement walls allows air to pass through but keeps moisture against the concrete and away from the insulation to be installed