Injector/Linac Design Status C. E
Injector/Linac Design Status C.E. Rago Lehman CD3B Review February 7-9, 2006 LCLS
2
Injector Beamline Design/Status
06 Design Regions Region Summary Status Drawing Assemblies Schedule & Tracking Summary
3
Injector Beamline Design Regions
Drive Laser May Laser Launch July Gun Region July Accel Region June Heater 1 Region June Wall Region Complete Injection Region Aug-Nov 2006 Spect Region FY 2006 Downtime Gun installation November 2006 Following Hot Test in Klystron Lab Injector Commissioning Start December 2006
4
Linac 2006 Installation BC1 component layout complete
Linac 1 (L1) LX Bunch Compressor 1 (BC1) Two short accelerator structures, refurbished Quads+BPMs,X&YCOR X-Band Structure (NLC) Quad + BPM, YCOR,XCOR, QE, Toroid Bunch Compressor & Diagnostics Emittance Diagnostics. Electrons Remove 5 S-Band Structures BC1 component layout complete Compressor articulation design & details complete & in fab L1 design and details complete & in fab less BPMs X-Band design complete & in fab Short structures available, undergoing testing for viability BC1 emittance diagnostics engineering starting including BLM
5
Design Status 2006 Installation
Gun Region Gun released to Fabrication (Bucking Coil under design) Gun Hot Test - Facility and Procedures underway via Klystron Department Assembly / Supports Updating design to Final Configuration Gun Region Diagnostics in detailed design (GTL) Accelerator Region Accelerator Structures / Dual Input Couplers in Assembly Integration of Solenoid / Accelerators / Diagnostics Region in detail design Heater Region Heater 1 Drift Tube in detail design Heater 2 Feasibility Layout Complete Wall Region 1St Stage Installation Complete Waiting Linac Access Insertion Region Vacuum and Supports In detail design Many Diagnostics in Fabrication
6
Design Status 2006 Installation
Spectrometer Region Similar to Insertion Region Spectrometer Magnet in magnetic design Temporary Beam Dump from SLC Final Focus Injector Infrastructure Floor, Cable Tray, and Base Supports to procurement Injector specific temperature control / refining design L1 Parts in Fabrication Installation Documents under final review BC1 Input (X-Band Compressor) Accelerating Structure from ILC on hand. Waveguide system in Fabrication BC1 Chicane System at Commercial Fabrication BC1 Output Layout Complete / in design Bunch Length Monitor / Transition from UCLA
7
LCLS Gun Assembly
8
GTL Gun Model
9
Accelerator Region
10
Heater Region
11
Injector Wall Region
12
Insertion/SAB Region Plan
13
L1 Region Design Installation ’06 down
Detail Drawings Complete except SA-BPM modification Uses existing shortened accelerator sections, injector quadrupoles and BPM bodies
14
BC1 Input / X-Band Compressor
15
BC1, Chicane Assembly
16
BC1 Output Model
17
Design Status Tracking
18
Design Summary Substantial Progress since last review
Design Status tracking used to status P3 INJ/LIN Group Organized & Focused on Installation We expect to install Gun to TD11 in support of commissioning December 06.