SiGe BiCMOS for Liquid Argon Front End Electronics
May 4, 2007 Mitch Newcomer, Sergio Rescia
2
LAr Signal Processing for SLHC
It’s likely that front end boards for LAr will need to be redesigned to meet radiation tolerance, rate and shaping requirements for SLHC. SiGe bipolar is being explored for the inner detector offers a potentially ideal technology for a next generation front end. Low rb good noise performance Hi Gm/Ic best current gain vs power technology. Mixture of bipolar with CMOS excellent for analog design Lateral PNP’s ?? Possibly rad hard enough for LAr. 3 May 2007 LAr Upgrade work FY08
3
LAr Upgrade FEB baseline design
3 May 2007 LAr Upgrade work FY08
4
FY07 - 08 Objectives Design work First Round : Prototype run:
Finish qualifying round of Radiation Studies with SCT. Study radiation effects on matching, noise on selected technology. Design work First Round : Building Blocks: current sources / references… Preamp topologies Shaper block Input protection Prototype run: Shared IBM run with SCT (8WL thru MOSIS $90K) IHP?? 3 May 2007 LAr Upgrade work FY08
5
BNL Finish 8WL irradiation Help develop noise testing program
Examine/develop Preamp topologies and associated test structures. Organize prototype run 3 May 2007 LAr Upgrade work FY08
6
Preliminary work on Preamp
3 May 2007 LAr Upgrade work FY08
7
Spice Simulations 3 May 2007 LAr Upgrade work FY08
8
Preamp Linearity Optimization
3 May 2007 LAr Upgrade work FY08
9
BNL manpower Analog Design SiGe Device Measurement
Sergio Rescia (EE) - 35% JF Pratte (EE) - 25% SiGe Device Measurement R. Hackenberg % (Meas. Firm/soft ware) J. Kierstead % ( Gamma irradiation) S. Rescia % ( Measurement/ Org.) Technician % 3 May 2007 LAr Upgrade work FY08
10
Penn Investigate Noise in SiGe Bipolar Devices with BNL.
Understand / Design input protection structures. Study/design SiGe BiCMOS Shaping Blocks. Facilitate front end Preamp Design. Measure fabricated devices. 3 May 2007 LAr Upgrade work FY08
11
Shaper Design Work Reduce Power 3 May 2007 LAr Upgrade work FY08
12
SiGe Resources People Mitch Newcomer 25 % Nandor Dressnandt 20 %
Student (EE) % Travel $3K 3 May 2007 LAr Upgrade work FY08
13
Nevis Setting up a device measurement facility to participate in radiation testing program. Postdoc arrives in May: will get started with visit to Penn to go over parametric testing. Tasks: Proton exposure at Mass General. Measure devices pre/post rad … 3 May 2007 LAr Upgrade work FY08
14
FY08 Preliminary Budget 3 May 2007 LAr Upgrade work FY08