1 Jaime Jordan, PE Project Manager Eric Germundson, EI Roadway Designer
Stevens Road Improvements E Main Street to Robert Trent Jones Boulevard Jaime Jordan, PE Project Manager Eric Germundson, EI Roadway Designer Introduce Jaime and self Introduce project partners (City and ODOT)

2 Presentation Outline Background Project Timeline Project Overview
Location Scope Design Elements Roadway Section Retaining Walls Detour Value Engineering Questions 5/22/18

3 Background City of Eagle Point Transportation System Plan
Congestion Mitigation and Air Quality Improvement (CMAQ) Program Funding Project Goals: Improve Public Safety: Pedestrian and bicycle safety in corridor Routes to Hillside Elementary School Support future development Idlewood Estates Bridgeport Subdivision TSP includes project to add sidewalk and bicycle lanes to Stevens CMAQ focuses on air quality and congestion Safety As developments sell, traffic increases 5/22/18

4 Project Timeline Current – Winter 2019 Spring 2019 Spring 2019 –
Final Design 90% Plans, Specifications & Construction Cost Estimate 100% Plans, Specifications & Construction Cost Estimate Current – Winter 2019 Right of Way Acquisition Permanent right of way and Easements Open Construction Bids Spring 2019 Construction Stevens Road Closed During Summer Hillside Elementary to Idlewood Drive Spring 2019 – ROW is concurrent with design 5/22/18

5 Project Location 5/22/18

6 Project Scope 5/22/18

7 Roadway Section Existing Proposed Existing lanes are 10 – 11 feet
No shoulders Sidewalk along Main, Bridgeport and Robert Trent Jones 5/22/18

8 Roadway Section Existing Proposed 5/22/18

9 Retaining Walls 3 Retaining Walls and 1 Modified Sidewalk
Simple construction Less expensive alternative 5/22/18

10 Street Lighting Cobrahead at intersections Decorative along street
5/22/18

11 Detour Road Closure (Local Access Only) Detour – 4 miles (Summer Only)
Shortest Detour Possible Allows no closure during the school year 5/22/18

12 Value Engineering Drainage Design Retaining Wall Design Traffic Design
Preliminary: Separate systems with water quality ponds ($$$) Advance: Combine systems and utilize modular water quality structure ($$) Retaining Wall Design Soldier Pile ($$$) Gravity ($$) Precast Concrete Block ($) Traffic Design Full Service option with Pacific Power Removal of Rectangular Rapid Flashing Beacon (RRFB) Roadway Design Pavement grind and inlay Half street improvements from Bridgeport Drive to Robert Trent Jones Boulevard Estimate for project came in higher than funding 5/22/18

13 Questions Jaime Jordan, PE Project Manager (541) Eric Germundson, EI Roadway Designer (971) Bob Atchison Right of Way Services (503) Nate Schroeder, PE, PTOE Traffic Engineering (503) 5/22/18