Download presentation
Presentation is loading. Please wait.
Published byAntonia Watkins Modified over 5 years ago
1
https://stemactivitiesforkids
2
Pipe Cleaner Challenge
An engineering, creativity and teamwork competition
3
Rules of engagement 15 pipe cleaners 2-4 students per team Mission: Build the tallest, free standing tower with only the materials provided .
4
Freeze Unexpected loss of resources in the company.
Each team member must now place one arm behind their back Keep working .
5
freeze You are outsourcing some engineering work to hundia
However, not everyone speaks the same language Teams can use both arms Continue working without speaking .
6
freeze Business is booming. Translators have been hired
Teams have 2 minutes to complete the task using arms and words!
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.