Presentation is loading. Please wait.

Presentation is loading. Please wait.

July, 2010 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing report for MBAN Study Group, July.

Similar presentations


Presentation on theme: "July, 2010 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing report for MBAN Study Group, July."— Presentation transcript:

1 July, 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing report for MBAN Study Group, July 2010 Meeting Date Submitted: July Source: Raymond Krasinski, Philips 345 Scarborough Road, Briarcliff Manor, NY 10510 Voice: , FAX: , Abstract: Closing report for MBAN Study Group Purpose: To outline the accomplishments of the group during the July 2010 Plenary meeting Notice: This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P Raymond Krasinski, Philips

2 2nd Meeting of the MBAN Study Group
July, 2010 IEEE MBAN SG Closing Report 2nd Meeting of the MBAN Study Group San Diego, USA July 11-15, 2010 Raymond Krasinski, Philips

3 doc.: IEEE 802.15-<doc#>
<month year> doc.: IEEE <doc#> July, 2010 Introduction History: MBAN Study Group voted into existence at the March 2010 (Orlando) meeting Chair: Raymond Krasinski, Philips Sect: David Evans, Philips Raymond Krasinski, Philips <author>, <company>

4 July, 2010 Mission of MBAN SG Study the prospects of an amendment of for MBAN If a task group is created it is expected to define any modifications required to the existing PHY and the possible modifications to the MAC needed to support the PHY that complies with the FCC MBAN regulations Generate a draft MBAN PAR and 5C Prepare a report to accompany PAR and 5C Raymond Krasinski, Philips

5 July, 2010 Progress July 2010 Meeting Discussed technical topics identified in May (Beijing) meeting Coexistence issues MBAN and 15.6 Parameters Transmit power and absorption rates Held a joint meeting with TG6 to discuss coexistence issues Updated the draft PAR and 5C Raymond Krasinski, Philips

6 Planning Achieve consensus on the PAR
July, 2010 Planning Achieve consensus on the PAR Achieve consensus on the 5 Criteria Address any new technical issues that arise on the MBAN reflector Discuss progress in the FCC MBAN regulatory deliberations Raymond Krasinski, Philips

7 July, 2010 Motion That WG request approval from the 802 EC to renew the MBAN study group. Moved by: Seconded by: Vote: y/n/a Raymond Krasinski, Philips


Download ppt "July, 2010 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing report for MBAN Study Group, July."

Similar presentations


Ads by Google