1 Avera St. Luke’s Therapy Addition January 2012 Update

2 Walls Painted All of the walls are painted in the north portion of the addition.

3 Exterior Windows Installed
Windows and glazing installed at exterior openings.

4 Cabinet Installation Ongoing
Cabinets installed on the north portion of the addition. South portion will be done in the February.

5 Looking Forward Started on remodel area end of January.
Addition will be completed in February, with the remodel area complete at the end of March.

6 A Great Job by BWBR Architects, Avera St
A Great Job by BWBR Architects, Avera St. Luke’s, Huff Construction and the rest of the design and construction team!