Download presentation
Presentation is loading. Please wait.
1
2004 Update on AMPS Operations
Kevin W. Manning Michael G. Duda Jordan G. Powers
2
Computational Grids
3
Plotting Windows
4
Time Series Locations
5
Time Series List
6
Sounding Locations
7
From 30-km Grid
8
10-km Grid
9
Old Peninsula Zoom ~200 ~910 ~1000 1125 ~1050
10
New Peninsula Zoom 828 1460 1803 1839 1659
11
New Web Products Cloud Base Altimeter Setting Tabular Time Series
Flight-level Winds/T Web Updates Larger Images More control on Animations
12
Cloud Base
13
Altimeter Setting
14
Tabular Time Series
15
Animations Page
16
3DVAR now default analysis technique
Objective Analysis 3DVAR now default analysis technique Currently, shows marginal improvement over traditional MM5 Objective Analysis Potential for a greater variety of observations to be assimilated 3DVAR better positions us for transition to WRF
17
Numbers 300 min Grid Dimensions (grid points) Projected Area (106 km2)
Forecast Hours Timestep (s) % of total CPU Wallclock (min) 1 90-km 110 x 145 127 72 240 3.83 11 2 30-km 220 x 208 40.7 80 33.04 99 3 10-km Ross I. 79 x 94 0.725 30 27 6.71 20 4 10-km S. Pole 85 x 85 0.706 6.53 5 3.3-km Ross I. 85 x 115 0.106 9 26.46 79 6 Peninsula 172 x 151 2.56 23.44 70 300 min
18
Product Availability Statistics
2002 2003 2004 Jan 62/62 100.0 % Feb 47/56 83.9 % Mar 55/62 88.7 % Apr 48/60 80.0 % May 60/62 96.8 % Jun 49/60 81.7 % Jul 53/62 85.5 % Aug 58/62 93.6 % Sep 58/60 96.7 % Oct 57/62 91.9 % Nov 57/60 95.0 % Dec 61/62 98.4 % 2002 665/730 91.1 % Jan 61/62 98.4 % Feb 56/56 100.0 % Mar 59/62 95.2 % Apr 60/60 May Jun Jul 56/62 90.3 % Aug 57/62 91.9 % Sep 58/60 96.7 % Oct 58/62 93.6 % Nov Dec 55/62 88.7 % 2003 699/730 95.8 % Jan 58/62 93.6 % Feb 54/58 93.1 % Mar 61/62 98.4 % Apr 51/60 85.0 % May 54/62 87.1 % Jun Jul Aug Sep Oct Nov Dec 2004 278/304 91.4 % Total: / %
19
Flow Chart (Much simplified)
20
Flow Chart (Much simplified)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.